Parcel: 13634744A

Inspection Status: Passed

Inspection History: RSBU - Building Progress

Permit Number - TC-RES-1222-01229

Inspection Description - RSBU - Building Progress

Inspection Status - Passed

Date Description Inspector Results Comments
06/26/2024 RSBU - Building Progress Passed Base plates are secured to concrete floor with shot pins, poured in place bolts or titan bolts. Plywood sheathing is properly secured to studs per plan requirements for shear walls. Okay to proceed with dry-in for stucco work. Roof trusses are properly secured to top plate with nails and H2.5 clips. Plywood sheathing is nailed to roof trusses per plan and code requirements. Okay to proceed with top out of plumbing and rough-in of mechanical and electrical.