Permit Reviews
Permit Number - TC-RES-1124-06593
Permit Status: Complete
Permit Description: Duplex
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/30/2025 | RESIDENTIAL NEW DWELLING v.2 | 05/21/2025 | REQUIRES RESUBMIT |
| 01/09/2026 | ADMINISTRATIVE v.3 | 01/09/2026 | APPROVED |
| 10/20/2025 | ADMINISTRATIVE v.1 | 10/20/2025 | REQUIRES RESUBMIT |
| 07/22/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 07/22/2026 | APPROVED |
| 08/21/2025 | RESIDENTIAL NEW DWELLING v.4 | 08/25/2025 | REQUIRES RESUBMIT |
| 09/15/2025 | RESIDENTIAL NEW DWELLING v.5 | 10/17/2025 | APPROVED |
| 10/17/2025 | RESTAMP - RESIDENTIAL v.1 | 10/20/2025 | APPROVED |
| 11/13/2024 | RESIDENTIAL NEW DWELLING v.1 | 12/18/2024 | REQUIRES RESUBMIT |
| 01/07/2026 | ADMINISTRATIVE v.2 | 01/07/2026 | REQUIRES RESUBMIT |
| 07/22/2025 | RESIDENTIAL NEW DWELLING v.3 | 08/04/2025 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-RES-1124-06593
Permit Status: Complete
Permit Description: Duplex
| Date | Description | Comments |
|---|---|---|
| 07/15/2026 | Submit the Air Leakage & Duct Tightness Test Report completed by an Approved Special Inspector prior to Final Inspections. | |
| 04/30/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 08/22/2025 | Parcel is located within a regulatory floodplain. Engineering review required prior to issuance, floodplain use permit may be required. Grading development package required to be submitted and approved prior to approval of this permit. | |
| 12/02/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 12/02/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ | |
| 12/02/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-RES-1124-06593
Permite Description: Duplex
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/08/2026 | COT - RSEL - Electrical Final | N/A | Re-inspection required | 07/08/2026 AC breaker over-amped at 40A, label calls for 30A. And AFCI on living room breaker. |
| 07/10/2026 | COT - RSEL - Electrical Underground | N/A | Not Applicable |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-1124-06593
Permit Description: Duplex
Total Completed Inspections - 18
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/11/2026 | COT - RSPL - Rough Soil | Passed | 2.11.26 Approved Ok to backfill |
|
| 02/12/2026 | COT - RSBU - Preslab | Passed | 02/12/2026 Duplex Unit 1. Approved per site plan, foundation details. Okay for concrete placement. |
|
| 02/20/2026 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 2-20-26; previously inspected & approved. | |
| 02/23/2026 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | Approved corrections were made. No additional items were found. 2/23/2026 | |
| 02/23/2026 | COT - RSBU - Roof Nailing | Passed | Approved corrections were made. No additional items were found. 2/23/2026 | |
| 03/03/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 3-3-26: intermediates approved. Okay to insulate and install drywall. Schedule a drywall screw inspection prior to tape & texture. | |
| 03/04/2026 | BULD - Electrical Clearance | Passed | 03/04/2026 Clearance TEP ECO. |
|
| 03/04/2026 | COT - RSEL - Grounding/Bonding | Passed | ||
| 03/09/2026 | COT - RSBU - Firewall/Fire Barrier/Firestop | Passed | 03/09/2026 Verified final 5/8" firewall at common wall. |
|
| 03/09/2026 | COT - RSBU - Interior Shear Bracing | Passed | 03/09/2026 Verified final 5/8" type-x firewall at common wall and interior drywall panels and nail schedule. Okay to tape and texture. |
|
| 05/27/2026 | COT - RSPL - Sewer | Passed | 5/27/2026 Okay to backfill, backwater valve installed. |
|
| 06/23/2026 | COT - RSPL - Yard Water Line | Passed | 06/23/2026 Holding under test from meter to riser. Okay to backfill, shading required. |
|
| 06/23/2026 | COT - RSEL - Outdoor Lighting | Passed | ||
| 07/08/2026 | COT - RSME - Mechanical Final | Passed | 07/08/2026 Corrections made. |
|
| 07/08/2026 | COT - RSPL - Plumbing Final | Passed | 07/08/2026 Corrections made. |
|
| 07/10/2026 | COT - RSEL - Electrical Final | Passed | 07/10/2026 Corrections made. |
|
| 07/10/2026 | RSBU - Building Final | Passed | ||
| 07/30/2026 | ENGR Engineering Final | Passed |