Permit: TC-RES-1024-06037
Permit Details
Status:
In Revision
Type:
Residential Building - One or Two Family
Address:
10468 E HEARTLEAF WILLOW DR
Apply Date:
10/16/2024
Applicant:
Project Manager
Description:
Installation of a 11.060kw dc system/1 Tesla Battery
Permit Reviews
Permit Number - TC-RES-1024-06037
Permit Status: In revision
Permit Description: Installation of a 11.060kw dc system/1 Tesla Battery
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
10/17/2024 | RESIDENTIAL SOLAR v.1 | 11/18/2024 | APPROVED |
02/18/2025 | RESIDENTIAL SOLAR REVISION v.1 | N/A | IN REVIEW |
Outstanding Inspections
Permit Status: In Revision
Permit Number: TC-RES-1024-06037
Permite Description: Installation of a 11.060kw dc system/1 Tesla Battery
Total Outstanding Inspections - 3
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/13/2025 | BULD - Electrical Clearance | N/A | Partial Pass | 06 FEB 25 TEP CLEARANCE: DGL |
02/13/2025 | RSBU - Building Final | N/A | Re-inspection required | 13 FEB 25 1. Tesla Powerwall is not installed per plan, sitting about 5" from ground, plan calls for 48 inches. 2. Wire length too short from MSP to DG disconnect should be min of 15.5 ft. |
02/13/2025 | COT - RSOL - Electrical Final Solar Project | N/A | Re-inspection required | 13 FEB 25 1. Tesla Powerwall is not installed per plan, sitting about 5" from ground, plan calls for 48 inches. 2. Wire length too short from MSP to DG disconnect should be min of 15.5 ft. |