Inspection History Details
Inspection Status: Re-inspection required
Inspection History: RSBU - Building Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/13/2025 | RSBU - Building Final | Re-inspection required | 13 FEB 25 1. Tesla Powerwall is not installed per plan, sitting about 5" from ground, plan calls for 48 inches. 2. Wire length too short from MSP to DG disconnect should be min of 15.5 ft. |
|
| 04/04/2025 | RSBU - Building Final | Passed |