Inspection History Details
Inspection Status: Partial Pass
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/06/2025 | BULD - Electrical Clearance | Partial Pass | 06 FEB 25 TEP CLEARANCE: DGL |
|
| 02/13/2025 | BULD - Electrical Clearance | Re-inspection required | 13 FEB 25 1. Tesla Powerwall is not installed per plan, sitting about 5" from ground, plan calls for 48 inches. 2. Wire length too short from MSP to DG disconnect should be min of 15.5 ft. |
|
| 04/04/2025 | BULD - Electrical Clearance | Passed |