Permit: TC-RES-0923-07801
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
6051 E 26TH ST
Address NEW:
6051 E 26TH ST
Apply Date:
09/06/2023
Applicant:
Alex Villanueva
Description:
Shade structure with solar panels REV1: PV interconnection changed from Line-side interconnection, to Load-side interconnection with a MPU.
Permit Reviews
Permit Number - TC-RES-0923-07801
Permit Status: Complete
Permit Description: Shade structure with solar panels
REV1: PV interconnection changed from Line-side interconnection, to Load-side interconnection with a MPU.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/23/2024 | RESIDENTIAL NEW DWELLING v.6 | 02/07/2024 | APPROVED |
| 01/17/2024 | RESIDENTIAL NEW DWELLING v.4 | 01/17/2024 | REQUIRES RESUBMIT |
| 12/20/2023 | RESIDENTIAL NEW DWELLING v.3 | 01/02/2024 | REQUIRES RESUBMIT |
| 09/07/2023 | RESIDENTIAL NEW DWELLING v.1 | 09/26/2023 | REQUIRES RESUBMIT |
| 12/17/2024 | RESIDENTIAL NEW DWELLING v.2 | 01/21/2025 | APPROVED |
| 12/15/2024 | RESIDENTIAL NEW DWELLING v.1 | 12/16/2024 | REQUIRES RESUBMIT |
| 02/07/2024 | RESTAMP - RESIDENTIAL v.1 | 02/07/2024 | APPROVED |
| 11/28/2023 | RESIDENTIAL NEW DWELLING v.2 | 12/12/2023 | REQUIRES RESUBMIT |
| 01/22/2024 | RESIDENTIAL NEW DWELLING v.5 | 01/23/2024 | REQUIRES RESUBMIT |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0923-07801
Permit Description: Shade structure with solar panels
REV1: PV interconnection changed from Line-side interconnection, to Load-side interconnection with a MPU.
Total Completed Inspections - 7
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/14/2025 | COT - RSBU - Preslab | Passed | 2/24/2025. Passed | |
| 02/14/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 2/24/2025. Passed | |
| 02/18/2025 | COT - RSEL - Grounding/Bonding | Passed | ||
| 02/18/2025 | COT - RSBU - Roof Nailing | Passed | ||
| 02/18/2025 | RSBU - Building Final | Passed | ||
| 02/18/2025 | BULD - Electrical Clearance | Passed | Approved solar and detached structure - DGC Clearance to TEP is required for the solar meter | |
| 02/18/2025 | COT - RSEL - Electrical Final | Passed |