Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Address:
6051 E 26TH ST
Address NEW:
6051 E 26TH ST
Apply Date:
09/06/2023
Applicant:
Alex Villanueva
Description:
Shade structure with solar panels REV1: PV interconnection changed from Line-side interconnection, to Load-side interconnection with a MPU.

Permit Reviews

Permit Number - TC-RES-0923-07801
Permit Status: Complete
Permit Description: Shade structure with solar panels REV1: PV interconnection changed from Line-side interconnection, to Load-side interconnection with a MPU.
Start Date Submittal Complete Date Status  
01/23/2024 RESIDENTIAL NEW DWELLING v.6 02/07/2024 APPROVED Review Details
01/17/2024 RESIDENTIAL NEW DWELLING v.4 01/17/2024 REQUIRES RESUBMIT Review Details
12/20/2023 RESIDENTIAL NEW DWELLING v.3 01/02/2024 REQUIRES RESUBMIT Review Details
09/07/2023 RESIDENTIAL NEW DWELLING v.1 09/26/2023 REQUIRES RESUBMIT Review Details
12/17/2024 RESIDENTIAL NEW DWELLING v.2 01/21/2025 APPROVED Review Details
12/15/2024 RESIDENTIAL NEW DWELLING v.1 12/16/2024 REQUIRES RESUBMIT Review Details
02/07/2024 RESTAMP - RESIDENTIAL v.1 02/07/2024 APPROVED Review Details
11/28/2023 RESIDENTIAL NEW DWELLING v.2 12/12/2023 REQUIRES RESUBMIT Review Details
01/22/2024 RESIDENTIAL NEW DWELLING v.5 01/23/2024 REQUIRES RESUBMIT Review Details

Completed Inspections

Permit Status: Complete
Permit Number: TC-RES-0923-07801
Permit Description: Shade structure with solar panels REV1: PV interconnection changed from Line-side interconnection, to Load-side interconnection with a MPU.
Total Completed Inspections - 7
Date Description Inspector Results Comments
02/14/2025 COT - RSBU - Preslab Passed 2/24/2025. Passed
02/14/2025 COT - RSBU - Excavation/Rebar/Zoning Passed 2/24/2025. Passed
02/18/2025 COT - RSEL - Grounding/Bonding Passed
02/18/2025 COT - RSBU - Roof Nailing Passed
02/18/2025 RSBU - Building Final Passed
02/18/2025 BULD - Electrical Clearance Passed Approved solar and detached structure - DGC Clearance to TEP is required for the solar meter
02/18/2025 COT - RSEL - Electrical Final Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
PATRICKMCCLURE_V2.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
REVISED STAMPED PLANS_V2.PDF DOCUMENTS VIEW
MCCLURE_PATRICK_SPECIAL_INSPECTION_CERTIFICATE_SEALED-2023-11-27_VA-2023-12-07_V1.PDF DOCUMENTS VIEW