Inspection History Details
Inspection Status: Passed
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/18/2025 | BULD - Electrical Clearance | Passed | Approved solar and detached structure - DGC Clearance to TEP is required for the solar meter | |
| 08/26/2024 | BULD - Electrical Clearance | Canceled | CA, unable to contact after several attempts | |
| 09/17/2024 | BULD - Electrical Clearance | Canceled | CA by contractor | |
| 12/10/2024 | BULD - Electrical Clearance | Partial Pass | Partial for the 200A service panel upgrade - INCR Clearance was called into TEP at 12:15pm Pending solar |