Permit: TC-RES-0625-03290
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
1016 S RUBIO AV
Address NEW:
1016 S RUBIO AV
Apply Date:
06/30/2025
Applicant:
Gustavo Silva
Description:
REV1: Amended the ledger to be 2x10 Studio/Office
Permit Reviews
Permit Number - TC-RES-0625-03290
Permit Status: Complete
Permit Description: REV1: Amended the ledger to be 2x10
Studio/Office
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 12/31/2025 | RESIDENTIAL ADD/ALT v.2 | 02/04/2026 | REQUIRES RESUBMIT |
| 02/26/2026 | ADMINISTRATIVE v.1 | N/A | REQUIRES RESUBMIT |
| 03/02/2026 | ADMINISTRATIVE v.2 | 03/02/2026 | APPROVED |
| 05/19/2026 | RESIDENTIAL NEW DWELLING REVISION v.1 | N/A | REQUIRES RESUBMIT |
| 02/18/2026 | RESIDENTIAL ADD/ALT v.3 | 02/26/2026 | APPROVED |
| 07/02/2025 | RESIDENTIAL ADD/ALT v.1 | 08/01/2025 | REQUIRES RESUBMIT |
| 08/10/2026 | RESIDENTIAL NEW DWELLING REVISION v.2 | 08/11/2026 | APPROVED |
Conditions
Permit Number - TC-RES-0625-03290
Permit Status: Complete
Permit Description: REV1: Amended the ledger to be 2x10
Studio/Office
| Date | Description | Comments |
|---|---|---|
| 06/30/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-RES-0625-03290
Permite Description: REV1: Amended the ledger to be 2x10
Studio/Office
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/15/2026 | COT - RSBU - Masonry Pregrout | N/A | Partial Pass | Partial proceed to third lift |
| 04/28/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Not Ready | Receptacles that exceed the box fill has to be replaced with bigger box to meet the cubic inches. Provide ko seals, grommets, and ground screws at all metal boxes. Provide proper cable to run in cavity and soon to be covered with plaster. Properly secure cables through once installed. Provide 1 1/4” cavity to protect it from physical damage. Per section 334.12 (B) #2 nm cable is not allowed per installation requirements. 4/28/2026 |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0625-03290
Permit Description: REV1: Amended the ledger to be 2x10
Studio/Office
Total Completed Inspections - 13
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/04/2026 | COT - RSPL - Rough Soil | Passed | Ok to.cover progress areas. | |
| 03/04/2026 | COT - RSBU - Preslab | Passed | Ok to place concrete in slab areas. Ensure slab area is termite treated. | |
| 03/04/2026 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Footings for new structure. Ok to place concrete in progress areas. | |
| 03/04/2026 | COT - RSPL - Sewer | Passed | Sewer line from structure is connected to existing main sewer line. Ok to cover progress areas | |
| 03/06/2026 | COT - RSEL - Electrical Underground | Passed | Okay to backfill. Shading required. 3/6/2026 | |
| 04/15/2026 | COT - RSBU - Masonry Pregrout | Passed | Passed 4/15/26 | |
| 04/22/2026 | COT - RSBU - Roof Nailing | Passed | Verified rafters, bolts, and hangers in place. Plans call for a 3x10 ledger. A change will be submitted prior to final. 4/22/2026 | |
| 04/29/2026 | COT - RSPL - Yard Water Line | Passed | ||
| 05/19/2026 | RSBU - Building Final | Passed | ||
| 05/19/2026 | COT - RSEL - Outdoor Lighting | Passed | ||
| 05/19/2026 | COT - RSME - Mechanical Final | Passed | ||
| 05/19/2026 | COT - RSEL - Electrical Final | Passed | ||
| 05/19/2026 | COT - RSPL - Plumbing Final | Passed |