Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Address NEW:
902 W PENNSYLVANIA ST
Apply Date:
04/29/2024
Applicant:
Oscar Juarez
Description:
SFR at parcel 2 of subdivided Plat

Permit Reviews

Permit Number - TC-RES-0424-02593
Permit Status: Complete
Permit Description: SFR at parcel 2 of subdivided Plat
Start Date Submittal Complete Date Status  
09/30/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 10/04/2024 APPROVED Review Details
06/12/2024 RESIDENTIAL NEW DWELLING v.2 06/24/2024 APPROVED Review Details
05/01/2024 RESIDENTIAL NEW DWELLING v.1 05/30/2024 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - TC-RES-0424-02593
Permit Status: Complete
Permit Description: SFR at parcel 2 of subdivided Plat
Date Description Comments
05/15/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
05/15/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-RES-0424-02593
Permite Description: SFR at parcel 2 of subdivided Plat
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
08/20/2024 COT - RSPL - Rough Soil N/A Re-inspection required 8/20/24: pipes must be (burped) in order to release all trapped air from system and have all fittings tested under 5' of pressure above highest fitting. 1" pex must be pressurized prior to backfill. Shading material required.

Completed Inspections

Permit Status: Complete
Permit Number: TC-RES-0424-02593
Permit Description: SFR at parcel 2 of subdivided Plat
Total Completed Inspections - 15
Date Description Inspector Results Comments
08/21/2024 COT - RSPL - Rough Soil Passed 8/20/24: pipes must be (burped) in order to release all trapped air from system and have all fittings tested under 5' of pressure above highest fitting. 1" pex must be pressurized prior to backfill. Shading material required.
8/21/24: corrections made ok to proceed with backfill. Shading required
08/21/2024 COT - RSPL - Yard Water Line Passed 8/21/24: 1" pex ran from future location of meter to P.O.C at home. Ok to backfill progress area.
08/28/2024 COT - RSBU - Preslab Passed 8/27/24: #4 rebar requires 24" of overlap at splices, 3" of clearance required around reinforcement, wrap all plumbing pipes that will be encased in concrete, footings must be 12" below grade, clear all footings of debris.
8/28/24: passed.
09/11/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
09/11/2024 COT - RSEL - Grounding/Bonding Passed
09/13/2024 COT - RSBU - Roof Nailing Passed
09/13/2024 BULD - Electrical Clearance Passed 9/11/24: Temp GFCI must be installed for clearance. Address tag required for clearance
9/13/24: ECO TEP Clearance For 902 W PENNSYLVANIA ST
09/13/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
09/24/2024 COT - RSPL - Sewer Passed
10/01/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed Ok to insulate and cover walls.
11/21/2024 COT - RSEL - Outdoor Lighting Passed
11/21/2024 COT - RSPL - Plumbing Final Passed
11/21/2024 COT - RSEL - Electrical Final Passed
11/21/2024 COT - RSME - Mechanical Final Passed
11/21/2024 RSBU - Building Final Passed