Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSPL - Rough Soil
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/20/2024 | COT - RSPL - Rough Soil | Re-inspection required | 8/20/24: pipes must be (burped) in order to release all trapped air from system and have all fittings tested under 5' of pressure above highest fitting. 1" pex must be pressurized prior to backfill. Shading material required. | |
| 08/21/2024 | COT - RSPL - Rough Soil | Passed | 8/20/24: pipes must be (burped) in order to release all trapped air from system and have all fittings tested under 5' of pressure above highest fitting. 1" pex must be pressurized prior to backfill. Shading material required. 8/21/24: corrections made ok to proceed with backfill. Shading required |