Permit: TC-RES-0325-01502
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
1631 W TWIN RIDGE RD UNIT 2
Address NEW:
1631 W TWIN RIDGE RD UNIT 2
Apply Date:
03/24/2025
Applicant:
Francisco Gallardo
Description:
REV_1, Add dual meter unit; Accessory Dwelling Unit
Permit Reviews
Permit Number - TC-RES-0325-01502
Permit Status: Complete
Permit Description: REV_1, Add dual meter unit; Accessory Dwelling Unit
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 12/31/2025 | RESIDENTIAL ADU REVISION v.1 | 01/07/2026 | APPROVED |
| 11/13/2025 | ADMINISTRATIVE v.2 | 11/13/2025 | REQUIRES RESUBMIT |
| 10/13/2025 | RESIDENTIAL NEW DWELLING v.3 | 10/24/2025 | APPROVED |
| 06/29/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 06/30/2026 | APPROVED |
| 07/15/2025 | RESIDENTIAL NEW DWELLING v.2 | 07/15/2025 | REQUIRES RESUBMIT |
| 02/19/2026 | RESIDENTIAL ADU REVISION v.1 | 03/04/2026 | APPROVED |
| 04/03/2025 | RESIDENTIAL NEW DWELLING v.1 | 04/30/2025 | REQUIRES RESUBMIT |
| 10/24/2025 | ADMINISTRATIVE v.1 | 10/24/2025 | REQUIRES RESUBMIT |
| 06/18/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 06/18/2026 | REQUIRES RESUBMIT |
| 11/13/2025 | ADMINISTRATIVE v.3 | 11/13/2025 | APPROVED |
Conditions
Permit Number - TC-RES-0325-01502
Permit Status: Complete
Permit Description: REV_1, Add dual meter unit; Accessory Dwelling Unit
| Date | Description | Comments |
|---|---|---|
| 04/28/2025 | Please contact Pima County Addressing to resolve issue. Addressing@pima.gov or 520-724-9512 | |
| 04/03/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 04/28/2025 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-RES-0325-01502
Permite Description: REV_1, Add dual meter unit; Accessory Dwelling Unit
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/18/2026 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | N/A | Re-inspection required | 2.18.26 Multiple items from previous list have not been addressed - inspection stopped. |
| 03/25/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Re-inspection required | 3-25-26: missing smoke detector at hallway, secure all dwv, add Boca plates at sill & top plates at marked locations, fire foam all penetrations at top plates, dwv resting on top of 2x4 is not a listed means of support, therefore, add plumbers tape around dwv, remove cover plate at metal boxes in living room & at bedroom to verify ground, a 12" clearance between can lights and per lines is required. Either relocate per lines allowing for 12" clearance or block using plywood, drywall, osb. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0325-01502
Permit Description: REV_1, Add dual meter unit; Accessory Dwelling Unit
Total Completed Inspections - 13
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/30/2025 | COT - RSBU - Preslab | Passed | 12/30/2025 Approved per site plan. Verified existing fence will be moved to accommodate setbacks. Okay for concrete placement. |
|
| 12/30/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 12/30/2025 Approved per site plan. Verified existing fence will be moved to accommodate setbacks. Okay for concrete placement. |
|
| 02/20/2026 | COT - RSBU - Roof Nailing | Passed | 2-20-26: roof inspection approved. Okay to dry-in. | |
| 02/20/2026 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 2-20-26: exterior clips/sheathing approved. Okay to continue with construction. | |
| 03/11/2026 | COT - RSPL - Yard Water Line | Passed | 03/11/2026 Main water line under test with blue tracer wire and holding, approved to backfill with shading material. |
|
| 03/20/2026 | BULD - Electrical Clearance | Passed | 3/20/2026 Approved clearance TEP INCR for Unit 2 ADU cutover. TEP tech on site required re-inspect since subpanel in ADU was not completed prior to clearance. |
|
| 03/27/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 3.27.26 Corrections made, proceed |
|
| 04/03/2026 | COT - RSBU - Interior Shear Bracing | Passed | 4-3-26: okay to tape & texture drywall. | |
| 05/05/2026 | COT - RSME - Mechanical Final | Passed | 5.5.26 Approved |
|
| 05/05/2026 | COT - RSPL - Plumbing Final | Passed | 5.5.26 Approved |
|
| 05/05/2026 | COT - RSEL - Electrical Final | Passed | 5.5.26 Approved |
|
| 05/07/2026 | RSBU - Building Final | Passed | ||
| 05/12/2026 | COT - RSPL - Rough Soil | Passed | 05/12/2026 Passed on 5/5/26. |