Inspection History Details
Inspection Status: Partial Pass
Inspection History: COT - RSPL - Rough Soil
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/11/2026 | COT - RSPL - Rough Soil | Partial Pass | 03/11/2026 Partial pending 12/10/25 inspection items. Main water line under test and holding: approved to backfill with shading material. |
|
| 05/12/2026 | COT - RSPL - Rough Soil | Passed | 05/12/2026 Passed on 5/5/26. |
|
| 12/10/2025 | COT - RSPL - Rough Soil | Not Ready | Missing grey water per plan. Provide 2 way clean out before change of direction. Provide green tracer wire at time of inspection and secure to abs. Muddy condition throughout run of sewer line. Leave exposed trench to verify no leaks at time of next inspection. 12/10/2025 | |
| 12/12/2025 | COT - RSPL - Rough Soil | Passed | Approved. Corrections were made. 12/12/2025 |