Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/24/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Not Ready | ||
| 03/25/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | 3-25-26: missing smoke detector at hallway, secure all dwv, add Boca plates at sill & top plates at marked locations, fire foam all penetrations at top plates, dwv resting on top of 2x4 is not a listed means of support, therefore, add plumbers tape around dwv, remove cover plate at metal boxes in living room & at bedroom to verify ground, a 12" clearance between can lights and per lines is required. Either relocate per lines allowing for 12" clearance or block using plywood, drywall, osb. | |
| 03/26/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | 3-26-26: 5" x8" Boca plates are required at marked locations. Boca plates must extend at least 2" above sole plates and 2" below top plates. 2 Boca plates are required on each side of dwv in shower, use a 5" x 18" plate at the sole to protect the dwv on the back side of restroom/bedroom area. See 2018 IRC /Section P2603.2.1 for requirements related to protection of plastic piping. Again, add plumbers tape around dwv resting on the 2x4 above ceiling in the kitchen area. | |
| 03/27/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 3.27.26 Corrections made, proceed |