Permit: TC-RES-0324-01902
Permit Details
Status:
Issued
Type:
Residential Building - One or Two Family
Address:
5828 E 29TH ST UNIT 2
Address NEW:
5828 E 29TH ST UNIT 2
Apply Date:
03/31/2024
Applicant:
Donald Livingstone
Description:
ADU
Permit Reviews
Permit Number - TC-RES-0324-01902
Permit Status: Issued
Permit Description: ADU
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/25/2024 | RESIDENTIAL NEW DWELLING v.4 | 07/25/2024 | REQUIRES RESUBMIT |
| 07/24/2024 | RESIDENTIAL NEW DWELLING v.3 | 07/24/2024 | REQUIRES RESUBMIT |
| 07/16/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 07/21/2025 | REQUIRES RESUBMIT |
| 08/13/2024 | RESTAMP - RESIDENTIAL v.1 | 08/13/2024 | APPROVED |
| 04/03/2024 | RESIDENTIAL NEW DWELLING v.1 | 05/03/2024 | REQUIRES RESUBMIT |
| 06/27/2024 | RESIDENTIAL NEW DWELLING v.2 | 06/27/2024 | REQUIRES RESUBMIT |
| 08/26/2024 | RESIDENTIAL NEW DWELLING v.1 | 09/05/2024 | APPROVED |
| 08/09/2024 | RESIDENTIAL NEW DWELLING v.5 | 08/13/2024 | APPROVED |
| 07/24/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 07/30/2025 | APPROVED |
Conditions
Permit Number - TC-RES-0324-01902
Permit Status: Issued
Permit Description: ADU
| Date | Description | Comments |
|---|---|---|
| 04/03/2024 | Please contact Pima County Addressing to resolve issue. Addressing@pima.gov or 520-724-9512 | |
| 08/13/2024 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 04/18/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Issued
Permit Number: TC-RES-0324-01902
Permit Description: ADU
Total Completed Inspections - 13
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/10/2024 | COT - RSPL - Rough Soil | Passed | ||
| 09/27/2024 | COT - RSBU - Preslab | Passed | 9/27/24: forms are set, plumbing pipes are wrapped, rebar reinforcement is installed per plan, and Ufer ground is installed. Okay to pour concrete. | |
| 12/30/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 12/30/24: All items noted on the 11/19/24 inspection have been corrected and are complete. Okay to proceed with further work. | |
| 03/03/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Passed at Preslab, was not on docket | |
| 03/03/2025 | COT - RSBU - Roof Nailing | Passed | Passed at time of clip and nail, verified during intermediate inspection | |
| 03/03/2025 | COT - RSEL - Grounding/Bonding | Passed | Ufer properly installed and wired 3/3/25 | |
| 03/04/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 3/4/25 corrections made ok to proceed | |
| 06/03/2025 | BULD - Electrical Clearance | Passed | 6/3/25 TEP CLEARANCE: ECO 1. Missing address label |
|
| 07/15/2025 | RSBU - Building Final | Passed | ||
| 07/15/2025 | COT - RSEL - Electrical Final | Passed | ||
| 07/15/2025 | COT - RSME - Mechanical Final | Passed | ||
| 07/15/2025 | COT - RSPL - Yard Water Line | Passed | ||
| 07/15/2025 | COT - RSPL - Plumbing Final | Passed |