Permit: TC-RES-0324-01860
Permit Details
Status:
Inspections
Type:
Residential Building - One or Two Family
Address:
2131 E BANTAM RD
Address NEW:
2131 E BANTAM RD
Apply Date:
03/28/2024
Applicant:
Maria Rojel
Description:
Enclose Patio into Living Rooms & Kitchen Extension and Bedroom Suite Addition
Permit Reviews
Permit Number - TC-RES-0324-01860
Permit Status: Inspections
Permit Description: Enclose Patio into Living Rooms & Kitchen Extension and Bedroom Suite Addition
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 11/15/2024 | RESIDENTIAL NEW DWELLING v.5 | 11/26/2024 | REQUIRES RESUBMIT |
| 01/24/2025 | RESIDENTIAL NEW DWELLING v.6 | 01/24/2025 | APPROVED |
| 09/23/2024 | RESIDENTIAL NEW DWELLING v.4 | 10/30/2024 | REQUIRES RESUBMIT |
| 09/20/2024 | RESIDENTIAL NEW DWELLING v.3 | 09/20/2024 | REQUIRES RESUBMIT |
| 04/01/2024 | RESIDENTIAL NEW DWELLING v.1 | 05/02/2024 | REQUIRES RESUBMIT |
| 07/16/2024 | RESIDENTIAL NEW DWELLING v.2 | 08/22/2024 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-RES-0324-01860
Permit Status: Inspections
Permit Description: Enclose Patio into Living Rooms & Kitchen Extension and Bedroom Suite Addition
| Date | Description | Comments |
|---|---|---|
| 11/15/2024 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TC-RES-0324-01860
Permite Description: Enclose Patio into Living Rooms & Kitchen Extension and Bedroom Suite Addition
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/17/2025 | COT - RSPL - Sewer | N/A | Partial Pass | 6-17-25: partial pass-need to verify connection. Okay to backfill underground plumbing but reschedule when connection is made. |
| 06/17/2025 | COT - RSPL - Rough Soil | N/A | Partial Pass | 6-17-25: contractor to submit a revision for elimination of cleanouts on north side of build. Underground plumbing verified under test-okay to pour concrete at progress areas at own risk. |
| 06/17/2025 | RSPL - Plumbing Progress | N/A | Partial Pass | 6-17-25: contractor to submit a revision for elimination of cleanouts on north side of build. Underground plumbing verified under test-okay to pour concrete at progress areas at own risk. |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-RES-0324-01860
Permit Description: Enclose Patio into Living Rooms & Kitchen Extension and Bedroom Suite Addition
Total Completed Inspections - 6
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/17/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 6-17-25: preslab, excavation/reinforcement per plans. Okay to pour concrete. | |
| 06/17/2025 | COT - RSBU - Preslab | Passed | 6-17-25: preslab, excavation/reinforcement per plans. Okay to pour concrete. | |
| 03/10/2026 | COT - RSBU - Roof Nailing | Passed | 3/10/2026 Approved per plan. |
|
| 03/10/2026 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 3/10/2026 Approved per plan. |
|
| 03/10/2026 | BULD - Electrical Clearance | Passed | 3/10/2026 Clearance TEP INCR for panel relocation outside. |
|
| 03/10/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 3/10/2026 Added missing receptacle in hallway. |