Permit: TC-RES-0323-03476
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
1717 N JUSTIN LN
Address NEW:
1717 N JUSTIN LN
Apply Date:
03/09/2023
Applicant:
Fernando Hinojosa
Description:
Sleeping Quarters
Permit Reviews
Permit Number - TC-RES-0323-03476
Permit Status: Complete
Permit Description: Sleeping Quarters
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/02/2023 | RESIDENTIAL NEW DWELLING v.2 | 08/02/2023 | REQUIRES RESUBMIT |
| 08/23/2023 | RESIDENTIAL NEW DWELLING v.4 | 08/23/2023 | APPROVED |
| 03/10/2023 | RESIDENTIAL NEW DWELLING v.1 | 04/06/2023 | REQUIRES RESUBMIT |
| 08/21/2023 | RESIDENTIAL NEW DWELLING v.3 | 08/22/2023 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-RES-0323-03476
Permit Status: Complete
Permit Description: Sleeping Quarters
| Date | Description | Comments |
|---|---|---|
| 07/28/2023 | This project is within a floodplain and requires an elevation certificate. Submission and Issuance of a Floodplain Use Permit (FUP) is required PRIOR TO ISSUANCE of this permit. An intermediate Elevation Certificate is required PRIOR TO GRADING and/or PRE-SLAB INSPECTION. Submission of the final Elevation Certificate and completion of the Floodplain Use Permit is required PRIOR TO FINALING this permit. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-RES-0323-03476
Permite Description: Sleeping Quarters
Total Outstanding Inspections - 5
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/05/2024 | COT - RSPL - Plumbing Final | N/A | Canceled | |
| 04/05/2024 | COT - RSEL - Outdoor Lighting | N/A | Canceled | |
| 04/05/2024 | RSBU - Building Final | N/A | Canceled | |
| 04/05/2024 | COT - RSME - Mechanical Final | N/A | Canceled | |
| 04/05/2024 | COT - RSEL - Electrical Final | N/A | Canceled |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0323-03476
Permit Description: Sleeping Quarters
Total Completed Inspections - 14
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/10/2023 | COT - RSPL - Sewer | Passed | ||
| 10/11/2023 | COT - RSPL - Yard Water Line | Passed | 10-11-23: Main water line is complete to the southeast corner of casita with tracer wire from main meter to connecting point. All other underground plumbing lines and sewer connections have been approved by past inspections. Okay to shade all plumbing pipes and backfill trenches. | |
| 10/11/2023 | COT - RSPL - Rough Soil | Passed | 10-11-23: Main water line is complete to the southeast corner of casita with tracer wire from main meter to connecting point. All other underground plumbing lines and sewer connections have been approved by past inspections. Okay to shade all plumbing pipes and backfill trenches. | |
| 10/25/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 10-25-23: Footers are correct and properly dug, rebar reinforcement is in place, Ufer ground is in place in the front corner of building, and edge forms are set. Okay to pour concrete for slab and footings. | |
| 10/25/2023 | COT - RSBU - Preslab | Passed | 10-25-23: Footers are correct and properly dug, rebar reinforcement is in place, Ufer ground is in place in the front corner of building, and edge forms are set. Okay to pour concrete for slab and footings. | |
| 12/12/2023 | COT - RSBU - Roof Nailing | Passed | OK to dry in roof system. | |
| 12/12/2023 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | Ok to wrap and cover and exterior walls. | |
| 01/17/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Including underground electric. | |
| 01/17/2024 | COT - RSEL - Electrical Underground | Passed | ||
| 04/12/2024 | COT - RSPL - Plumbing Final | Passed | 4/12/24: Contractor has corrected items in above comments. Everything is good. Okay to issue Certificate of Occupancy for ADU. | |
| 04/12/2024 | COT - RSEL - Outdoor Lighting | Passed | 4/12/24: Contractor has corrected items in above comments. Everything is good. Okay to issue Certificate of Occupancy for ADU. | |
| 04/12/2024 | RSBU - Building Final | Passed | 4/12/24: Contractor has corrected items in above comments. Everything is good. Okay to issue Certificate of Occupancy for ADU. | |
| 04/12/2024 | COT - RSME - Mechanical Final | Passed | 4/12/24: Contractor has corrected items in above comments. Everything is good. Okay to issue Certificate of Occupancy for ADU. | |
| 04/12/2024 | COT - RSEL - Electrical Final | Passed | 4/12/24: Contractor has corrected items in above comments. Everything is good. Okay to issue Certificate of Occupancy for ADU. |