Inspection Status: Partial Pass
Inspection History: COT - RSPL - Rough Soil
| Date |
Description |
Inspector |
Results |
Comments |
|
COT - RSPL - Rough Soil |
|
Partial Pass |
10/6/23: new water service ok to cover from meter to south side of existing house. Rough soil in new Casita approved to cover. |
| 10/10/2023 |
COT - RSPL - Rough Soil |
|
Not Ready |
10/10/23; not ready main water line has not been made yet |
| 10/11/2023 |
COT - RSPL - Rough Soil |
|
Passed |
10-11-23: Main water line is complete to the southeast corner of casita with tracer wire from main meter to connecting point. All other underground plumbing lines and sewer connections have been approved by past inspections. Okay to shade all plumbing pipes and backfill trenches. |