Permit: TC-RES-0225-00785
Permit Details
Status:
Inspections
Type:
Residential Building - One or Two Family
Address:
533 W DAKOTA ST
Address NEW:
533 W DAKOTA ST
Apply Date:
02/11/2025
Applicant:
Jackquelin Guerrero
Description:
REV_1, Change fastening details; SFR
Permit Reviews
Permit Number - TC-RES-0225-00785
Permit Status: Inspections
Permit Description: REV_1, Change fastening details; SFR
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 12/22/2025 | RESIDENTIAL NEW DWELLING REVISION v.1 | 01/06/2026 | APPROVED |
| 04/25/2025 | RESIDENTIAL NEW DWELLING v.2 | 05/20/2025 | REQUIRES RESUBMIT |
| 11/03/2025 | RESIDENTIAL NEW DWELLING REVISION v.1 | 11/13/2025 | REQUIRES RESUBMIT |
| 12/03/2025 | RESTAMP - RESIDENTIAL v.1 | 12/04/2025 | APPROVED |
| 02/24/2025 | RESIDENTIAL NEW DWELLING v.1 | 03/31/2025 | REQUIRES RESUBMIT |
| 07/29/2025 | RESTAMP - RESIDENTIAL v.1 | 07/30/2025 | APPROVED |
| 07/02/2025 | RESIDENTIAL NEW DWELLING v.3 | 07/29/2025 | APPROVED |
| 10/27/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/27/2026 | APPROVED |
| 12/01/2025 | RESIDENTIAL NEW DWELLING REVISION v.2 | 12/02/2025 | APPROVED |
Conditions
Permit Number - TC-RES-0225-00785
Permit Status: Inspections
Permit Description: REV_1, Change fastening details; SFR
| Date | Description | Comments |
|---|---|---|
| 02/24/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 02/24/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 03/20/2025 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ | |
| 03/20/2025 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TC-RES-0225-00785
Permite Description: REV_1, Change fastening details; SFR
Total Outstanding Inspections - 4
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/10/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Not Ready | Not ready. Ensure lath is in place. Ensure roof is dry in and roof tile is loaded prior to intermediate. Ensure clip nail inspection is closed out before intermediate. 11/10/2025 |
| 10/27/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | N/A | Re-inspection required | 10-27-25: add an anchor to marked location at garage-anchor bolts are required within 12" at the end of each plate. Add shot pin within 6" at the end of plate and space 24" o.c., nailing for exterior not per plan-add nails along edges/joints no closer than 3/8" from joints and 12" o.c. In the field. Add nails to sheathing where nails over penetrate more than 1/8". Missing A35's and H25's at ledger at back exit to patio, add 2x6 blocking at 6' apart for gable end truss, add anchor bolts to all sides of columns and add studs per plans, missing Simpson nail plates to top plates at 48" o.c.-see plans for details.STOPPED INSPECTION-ADDITIONAL ITEMS MAY BE ADDED. |
| 05/28/2026 | COT - RSPL - Plumbing Final | N/A | Not Ready | 5/28/2026 Not ready. |
| 10/20/2026 | RSBU - Building Final | N/A | Partial Pass | 10/20/2026 Partial pass pending sewer and truss conditions need to be satisfied. |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-RES-0225-00785
Permit Description: REV_1, Change fastening details; SFR
Total Completed Inspections - 16
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/09/2025 | COT - RSPL - Sewer | Passed | 9-9-25: sewer connection approved. Okay to backfill with shading materials. | |
| 09/09/2025 | COT - RSPL - Rough Soil | Passed | 9-9-25: underground plumbing approved. Okay to backfill with shading materials. | |
| 12/30/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 12/30/2025 | BULD - Electrical Clearance | Passed | 12/30/25: ECO TEP CLEARANCE APPROVED | |
| 12/30/2025 | COT - RSBU - Preslab | Passed | ||
| 01/08/2026 | COT - RSBU - Interior Shear Bracing | Passed | 1-8-26: interior shear bracing approved-okay to tape & texture drywall. | |
| 04/28/2026 | COT - RSPL - Yard Water Line | Passed | ||
| 05/28/2026 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 5/28/2026 Passed on prior inspections, verified corrections made. |
|
| 05/28/2026 | COT - RSEL - Grounding/Bonding | Passed | 5/28/2026 Passed on prior inspections 12/30/25. |
|
| 05/28/2026 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 5/28/2026 Passed on prior inspections for foundation and footings, customer uncertain if needed inspection for driveway and rear patio slab. |
|
| 05/28/2026 | COT - RSBU - Roof Nailing | Passed | 5/28/2026 Approved. |
|
| 10/20/2026 | COT - RSEL - Electrical Final | Passed | ||
| 10/20/2026 | COT - RSPL - Plumbing Final | Passed | 10/20/2026 Painted plastic pipes outdoors. |
|
| 10/20/2026 | COT - RSEL - Outdoor Lighting | Passed | ||
| 10/20/2026 | COT - RSME - Mechanical Final | Passed | ||
| 10/21/2026 | RSBU - Building Final | Passed | 10/21/2026 Conditions satisfied. Uploaded truss design and sewer permit, see attachments. |