Permit: TC-RES-0224-01203
Permit Details
Status:
Inspections Complete
Type:
Residential Building - One or Two Family
Address:
130 W MICHIGAN DR
Address NEW:
130 W MICHIGAN DR
Apply Date:
02/29/2024
Applicant:
Carmen Santos
Description:
Remodel SFR
Permit Reviews
Permit Number - TC-RES-0224-01203
Permit Status: Inspections complete
Permit Description: Remodel SFR
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/29/2024 | RESIDENTIAL NEW DWELLING v.1 | 04/02/2024 | REQUIRES RESUBMIT |
| 05/06/2024 | RESTAMP - RESIDENTIAL v.1 | 05/07/2024 | APPROVED |
| 05/19/2025 | RESIDENTIAL NEW DWELLING v.1 | 06/20/2025 | APPROVED |
| 04/22/2024 | RESIDENTIAL NEW DWELLING v.2 | 05/06/2024 | APPROVED |
Conditions
Permit Number - TC-RES-0224-01203
Permit Status: Inspections complete
Permit Description: Remodel SFR
| Date | Description | Comments |
|---|---|---|
| 05/08/2024 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-RES-0224-01203
Permite Description: Remodel SFR
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/14/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | N/A | Re-inspection required | 7-14-25: Add anchor bolts 23" throughout-see details A-301#3&1. Add shot pins to marked areas-shot pins re required 6" from the end of an interior plate, several loose roof panels-add nails t marked locations, and a CS16 straps on interior posts to beam with 8 nails above and below connecting points.Submit a revision for all perimeter framing gaps along existing masonry walls, add nails to exterior sheathing at entry way where nails along edges/joints are closer than 3/8" and where overpenetrated more than 1/16". |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-RES-0224-01203
Permit Description: Remodel SFR
Total Completed Inspections - 16
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/12/2024 | COT - RSPL - Yard Water Line | Passed | 7/12/24: plumbing underground per plan ok to backfill. Shading required | |
| 07/12/2024 | COT - RSPL - Sewer | Passed | 7/12/24: plumbing underground per plan ok to backfill. Shading required | |
| 07/22/2024 | COT - RSBU - Preslab | Passed | ||
| 07/22/2024 | COT - RSPL - Rough Soil | Passed | ||
| 07/08/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 7.8.25 Column footers per plan per revision 1. 3 inch clearance maintain, proper depth excavated, #4 rebar as per plan. Ok to pour. |
|
| 07/21/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 7-21-25: exterior clips/sheathing approved. Okay to continue with construction. Note: add firefoam along interior framing at ceiling/rooftop gaps-this will be verified at intermediates. |
|
| 07/21/2025 | COT - RSBU - Roof Nailing | Passed | 7-21-25: okay to dry-in roof. | |
| 09/03/2025 | BULD - Electrical Clearance | Passed | 9/3/25: TEP ECO CLEARANCE | |
| 12/15/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 12/15/2025 | COT - RSEL - Electrical Underground | Passed | ||
| 12/15/2025 | COT - RSEL - Grounding/Bonding | Passed | ||
| 12/15/2025 | COT - RSPL - Plumbing Final | Passed | ||
| 12/15/2025 | RSBU - Building Final | Passed | 12/15/25 All corrections made. |
|
| 12/15/2025 | COT - RSEL - Electrical Final | Passed | 12/15/25 All corrections made. |
|
| 12/15/2025 | COT - RSEL - Outdoor Lighting | Passed | 12/15/25 All corrections made. |
|
| 12/15/2025 | COT - RSME - Mechanical Final | Passed | 12/15/25 All corrections made. |