Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Re-inspection required
Inspection History: COT - RSPL - Plumbing Final
| Date |
Description |
Inspector |
Results |
Comments |
| 11/17/2025 |
COT - RSPL - Plumbing Final |
|
Re-inspection required |
11-17-25: hammer arrestor missing at fridge & dishwasher, water closet and washer/dryer, exterior receptacles must be weather resistant, wrap hot leg of water heater with R3 insulation, arch fault breakers required for habitable areas which include, hallways, bedrooms, living room, and kitchen. Install a shackle at the water heater breaker, add a knockout plug at main panel, paint or seal all wood, seal opening at laundry vent opening at exterior side, paint all exterior plastic, missing thermostatic valve or individual control valves at shower, missing hard wire smoke detector at hallway, lower thermostat height to 48' o.c., egress sill height at bedroom windows must be 44" maximum. |
| 12/15/2025 |
COT - RSPL - Plumbing Final |
|
Passed |
|