Permit: TC-RES-0224-00619
Permit Details
Status:
Inspections Complete
Type:
Residential Building - One or Two Family
Address:
6802 S MISSIONDALE RD
Address NEW:
6802 S MISSIONDALE RD
Apply Date:
02/02/2024
Applicant:
Gilberto Gamboa
Description:
SFR
Permit Reviews
Permit Number - TC-RES-0224-00619
Permit Status: Inspections complete
Permit Description: SFR
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/06/2024 | RESIDENTIAL NEW DWELLING v.1 | 02/29/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-RES-0224-00619
Permit Status: Inspections complete
Permit Description: SFR
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 02/14/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Conditions
Permit Number - TC-RES-0224-00619
Permit Status: Inspections complete
Permit Description: SFR
| Date | Description | Comments |
|---|---|---|
| 03/05/2024 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 02/14/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-RES-0224-00619
Permite Description: SFR
Total Outstanding Inspections - 9
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/26/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | N/A | Re-inspection required | 4/25/24: anchor bolt spacing greater than 48" O.C at bedroom one south wall, Gable ends not per plan. |
| 05/07/2024 | COT - RSPL - Yard Water Line | N/A | Not Ready | 5/7/24: not ready |
| 05/06/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Not Ready | |
| 10/07/2024 | COT - RSEL - Electrical Underground | N/A | Canceled | 10/4/24: canceled by contractor no access |
| 10/07/2024 | COT - RSEL - Outdoor Lighting | N/A | Canceled | 10/4/24: canceled by contractor no access |
| 10/07/2024 | COT - RSEL - Electrical Final | N/A | Canceled | 10/4/24: canceled by contractor no access |
| 10/07/2024 | COT - RSME - Mechanical Final | N/A | Canceled | 10/4/24: canceled by contractor no access |
| 10/07/2024 | COT - RSPL - Plumbing Final | N/A | Canceled | 10/4/24: canceled by contractor no access |
| 10/07/2024 | RSBU - Building Final | N/A | Canceled | 10/4/24: canceled by contractor no access |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-RES-0224-00619
Permit Description: SFR
Total Completed Inspections - 15
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/04/2024 | COT - RSPL - Rough Soil | Passed | 4/1/24: Underground plumbing not under test. 4/3/24: underground plumbing not per plans missing gray water discharge 4/4/24: corrections made ok to backfill. Shading required |
|
| 04/05/2024 | COT - RSEL - Grounding/Bonding | Passed | 4/5/24: passed. | |
| 04/05/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 4/3/24: canceled per Memo 4/5/24: passed ok to pour |
|
| 04/05/2024 | COT - RSBU - Preslab | Passed | 4/3/24: canceled per Memo 4/5/24: passed ok to pour |
|
| 04/25/2024 | COT - RSBU - Roof Nailing | Passed | ||
| 05/16/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 4/25/24: anchor bolt spacing greater than 48" O.C at bedroom one south wall, Gable ends not per plan. Back porch pending 5/6/24 cancel by contractor 5/16/24L corrections made. |
|
| 05/16/2024 | COT - RSPL - Yard Water Line | Passed | 5/7/24: not ready 5/16/24: passed ok to backfill. Shading required. |
|
| 05/16/2024 | COT - RSPL - Sewer | Passed | 5/7/24: not ready 5/16/24: passed, ok backfill. Shading required |
|
| 05/16/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 5/6/24 cancel by contractor 5/16/24: passed. Ok to proceed |
|
| 08/30/2024 | BULD - Electrical Clearance | Passed | Approved new 200A service panel - ECO Clearance to TEP is required for the new service | |
| 10/08/2024 | COT - RSEL - Outdoor Lighting | Passed | ||
| 10/08/2024 | COT - RSEL - Electrical Final | Passed | ||
| 10/08/2024 | COT - RSME - Mechanical Final | Passed | Canceled per contractor. 9/19/2024 10/4/24: canceled by contractor no access 10/8/24: condensate drain requires 90degree and must terminate 6" above grade, insulation required at exterior hose bib, clean outs must be capped and cut to grade. UV coat exterior plastic piping. 10/8/24: corrections made ok for CofO |
|
| 10/08/2024 | COT - RSPL - Plumbing Final | Passed | Canceled per contractor. 9/19/2024 10/4/24: canceled by contractor no access 10/8/24: condensate drain requires 90degree and must terminate 6" above grade, insulation required at exterior hose bib, clean outs must be capped and cut to grade. UV coat exterior plastic piping. 10/8/24: corrections made ok for CofO |
|
| 10/08/2024 | RSBU - Building Final | Passed | Canceled per contractor. 9/19/2024 10/4/24: canceled by contractor no access 10/8/24: condensate drain requires 90degree and must terminate 6" above grade, insulation required at exterior hose bib, clean outs must be capped and cut to grade. UV coat exterior plastic piping. 10/8/24: corrections made. |