Inspection History Details
Inspection Status: Canceled
Inspection History: COT - RSPL - Plumbing Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/19/2024 | COT - RSPL - Plumbing Final | Canceled | Canceled per contractor. 9/19/2024 | |
| 10/07/2024 | COT - RSPL - Plumbing Final | Canceled | 10/4/24: canceled by contractor no access | |
| 10/08/2024 | COT - RSPL - Plumbing Final | Passed | Canceled per contractor. 9/19/2024 10/4/24: canceled by contractor no access 10/8/24: condensate drain requires 90degree and must terminate 6" above grade, insulation required at exterior hose bib, clean outs must be capped and cut to grade. UV coat exterior plastic piping. 10/8/24: corrections made ok for CofO |
|
| 10/08/2024 | COT - RSPL - Plumbing Final | Re-inspection required | Canceled per contractor. 9/19/2024 10/4/24: canceled by contractor no access 10/8/24: condensate drain requires 90degree and must terminate 6" above grade, insulation required at exterior hose bib, clean outs must be capped and cut to grade. UV coat exterior plastic piping. |