Inspection History Details
Inspection Status: Canceled
Inspection History: RSBU - Building Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/19/2024 | RSBU - Building Final | Canceled | Canceled per contractor. 9/19/2024 | |
| 10/07/2024 | RSBU - Building Final | Canceled | 10/4/24: canceled by contractor no access | |
| 10/08/2024 | RSBU - Building Final | Passed | Canceled per contractor. 9/19/2024 10/4/24: canceled by contractor no access 10/8/24: condensate drain requires 90degree and must terminate 6" above grade, insulation required at exterior hose bib, clean outs must be capped and cut to grade. UV coat exterior plastic piping. 10/8/24: corrections made. |
|
| 10/08/2024 | RSBU - Building Final | Re-inspection required | Canceled per contractor. 9/19/2024 10/4/24: canceled by contractor no access 10/8/24: condensate drain requires 90degree and must terminate 6" above grade, insulation required at exterior hose bib, clean outs must be capped and cut to grade. UV coat exterior plastic piping. |