Inspection Status: Canceled

Inspection History: RSBU - Building Final 

Date Description Inspector Results Comments
09/19/2024 RSBU - Building Final  Canceled Canceled per contractor. 9/19/2024
10/07/2024 RSBU - Building Final  Canceled 10/4/24: canceled by contractor no access
10/08/2024 RSBU - Building Final  Passed Canceled per contractor. 9/19/2024
10/4/24: canceled by contractor no access
10/8/24: condensate drain requires 90degree and must terminate 6" above grade, insulation required at exterior hose bib, clean outs must be capped and cut to grade. UV coat exterior plastic piping.
10/8/24: corrections made.
10/08/2024 RSBU - Building Final  Re-inspection required Canceled per contractor. 9/19/2024
10/4/24: canceled by contractor no access
10/8/24: condensate drain requires 90degree and must terminate 6" above grade, insulation required at exterior hose bib, clean outs must be capped and cut to grade. UV coat exterior plastic piping.