Permit: TC-RES-0223-02907
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
4018 E 3RD ST UNIT 2
Address NEW:
4018 E 3RD ST UNIT 2
Apply Date:
02/16/2023
Applicant:
David Shambach
Description:
Remodel Guest House into ADU - CE-VIO0623-04179
Permit Reviews
Permit Number - TC-RES-0223-02907
Permit Status: Complete
Permit Description: Remodel Guest House into ADU - CE-VIO0623-04179
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/18/2024 | RESIDENTIAL NEW DWELLING v.12 | 07/19/2024 | APPROVED |
| 09/18/2023 | RESIDENTIAL NEW DWELLING v.6 | 10/19/2023 | REQUIRES RESUBMIT |
| 11/17/2023 | RESIDENTIAL NEW DWELLING v.8 | 12/12/2023 | REQUIRES RESUBMIT |
| 07/19/2024 | RESTAMP - RESIDENTIAL v.1 | 07/29/2024 | APPROVED |
| 01/10/2024 | RESIDENTIAL NEW DWELLING v.10 | 01/31/2024 | REQUIRES RESUBMIT |
| 11/13/2023 | RESIDENTIAL NEW DWELLING v.7 | 11/14/2023 | REQUIRES RESUBMIT |
| 06/18/2024 | RESIDENTIAL NEW DWELLING v.11 | 07/17/2024 | REQUIRES RESUBMIT |
| 07/21/2023 | RESIDENTIAL NEW DWELLING v.3 | 08/07/2023 | REQUIRES RESUBMIT |
| 08/10/2023 | RESIDENTIAL NEW DWELLING v.4 | 08/10/2023 | REQUIRES RESUBMIT |
| 08/25/2023 | RESIDENTIAL NEW DWELLING v.5 | 08/25/2023 | REQUIRES RESUBMIT |
| 12/13/2023 | RESIDENTIAL NEW DWELLING v.9 | 01/08/2024 | REQUIRES RESUBMIT |
| 07/21/2023 | RESIDENTIAL NEW DWELLING v.2 | 07/21/2023 | REQUIRES RESUBMIT |
| 02/28/2023 | RESIDENTIAL NEW DWELLING v.1 | 03/09/2023 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-RES-0223-02907
Permit Status: Complete
Permit Description: Remodel Guest House into ADU - CE-VIO0623-04179
| Date | Description | Comments |
|---|---|---|
| 01/10/2024 | Please contact Pima County Addressing to resolve issue. Addressing@pima.gov or 520-724-9512 | |
| 09/05/2023 | This project is within a floodplain and requires an elevation certificate. Submission and Issuance of a Floodplain Use Permit (FUP) is required PRIOR TO ISSUANCE of this permit. An intermediate Elevation Certificate is required PRIOR TO GRADING and/or PRE-SLAB INSPECTION. Submission of the final Elevation Certificate and completion of the Floodplain Use Permit is required PRIOR TO FINALING this permit. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-RES-0223-02907
Permite Description: Remodel Guest House into ADU - CE-VIO0623-04179
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/30/2024 | COT - RSBU - Preslab | N/A | Partial Pass | awaiting info from architect |
| 01/16/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Not Ready | Work incomplete. |
| 02/25/2025 | COT - RSEL - Electrical Underground | N/A | Not Applicable | no electrical underground |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0223-02907
Permit Description: Remodel Guest House into ADU - CE-VIO0623-04179
Total Completed Inspections - 12
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/07/2025 | COT - RSBU - Preslab | Passed | 1-7-25, verified 2 #4 rebar for small section of intended slab at carport area. Okay to pour concrete. | |
| 01/16/2025 | COT - RSPL - Yard Water Line | Passed | ||
| 01/28/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 01/28/2025 | COT - RSBU - Roof Nailing | Passed | ||
| 02/25/2025 | COT - RSME - Mechanical Final | Passed | Passed final 2/25/25 | |
| 02/25/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Passed 1/7/25 by Fernando | |
| 02/25/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | Passed by Robert Chandler 1/28/25 | |
| 02/25/2025 | COT - RSEL - Outdoor Lighting | Passed | Passed final 2/25/25 | |
| 02/25/2025 | COT - RSPL - Rough Soil | Passed | Passed via letter | |
| 02/25/2025 | RSBU - Building Final | Passed | Passed final 2/25/25 | |
| 02/25/2025 | COT - RSEL - Electrical Final | Passed | Passed ELECTRICAL CLEARANCE ECO 2/25/25 | |
| 02/25/2025 | COT - RSPL - Plumbing Final | Passed | Passed final 2/25/25 |