Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Address NEW:
7358 S DEMPSEY AV
Apply Date:
04/02/2025
Applicant:
Celina Rodriguez
Description:
KB Home 2467 (Model master plan TC-MDP-1124-01304)

Permit Reviews

Permit Number - TC-MDP-1224-01401
Permit Status: Inspections complete
Permit Description: KB Home 2467 (Model master plan TC-MDP-1124-01304)
Start Date Submittal Complete Date Status  
04/03/2025 SITE FROM MODEL PERMIT - PRODUCTION v.1 04/14/2025 REQUIRES RESUBMIT Review Details
05/07/2025 RESTAMP - RESIDENTIAL v.1 05/12/2025 APPROVED Review Details
04/18/2025 SITE FROM MODEL PERMIT - PRODUCTION v.2 04/25/2025 REQUIRES RESUBMIT Review Details
05/07/2025 SITE FROM MODEL PERMIT - PRODUCTION v.4 05/07/2025 APPROVED Review Details
05/05/2025 SITE FROM MODEL PERMIT - PRODUCTION v.3 05/07/2025 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-1224-01401
Permit Status: Inspections complete
Permit Description: KB Home 2467 (Model master plan TC-MDP-1124-01304)
Total Outstanding Activity Conditions - 5
Date Name
04/11/2025 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
04/11/2025 Post-Installed Anchor Inspection Report is required.
04/11/2025 Post-Tension Inspection Report is required.
04/11/2025 Soil Compaction Special Inspection is Required.
12/20/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/

Conditions

Permit Number - TC-MDP-1224-01401
Permit Status: Inspections complete
Permit Description: KB Home 2467 (Model master plan TC-MDP-1124-01304)
Date Description Comments
12/20/2024 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
12/20/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
04/11/2025 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-1224-01401
Permite Description: KB Home 2467 (Model master plan TC-MDP-1124-01304)
Total Outstanding Inspections - 4
Last Inspection Date Description Inspector Results Comments
05/29/2025 COT - RSBU - Excavation/Rebar/Zoning N/A Re-inspection required 5-29-25, compact pad around electrical conduits and around footing area around garage. Remove all loose dirt from footings and wrap all DWV piping.
05/29/2025 COT - RSBU - Preslab N/A Re-inspection required 5-29-25, compact pad around electrical conduits and around footing area around garage. Remove all loose dirt from footings and wrap all DWV piping.
09/19/2025 COT - BULD - SWG Clearance N/A Not Applicable 9.19.2025
NA
09/19/2025 COT - RSPL - Gas Pressure Test N/A Not Applicable 9.19.2025
NA

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-1224-01401
Permit Description: KB Home 2467 (Model master plan TC-MDP-1124-01304)
Total Completed Inspections - 17
Date Description Inspector Results Comments
05/22/2025 COT - RSPL - Rough Soil Passed 5/22/25 corrections made
05/22/2025 COT - RSPL - Sewer Passed 5/22/25 corrections made
05/22/2025 COT - RSPL - Yard Water Line Passed 5/22/25 corrections made
05/29/2025 COT - RSEL - Electrical Underground Passed 5-29-25, electrical underground approved.
06/16/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
06/16/2025 COT - RSBU - Roof Nailing Passed Passed 6/16/25
07/22/2025 COT - RSBU - Interior Shear Bracing Passed 7-22-25: interior shear bracing inspection approved. Okay to tape & texture.
09/04/2025 BULD - Electrical Clearance Passed 9.4.2025
Clearance for TEP ECO.
09/04/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 9.4.2025
Letter provided, upload to TDC dashboard prior to final.
09/04/2025 COT - RSEL - Grounding/Bonding Passed
09/19/2025 COT - RSEL - Electrical Final Passed
09/19/2025 COT - RSEL - Outdoor Lighting Passed
09/19/2025 COT - RSME - Mechanical Final Passed
09/19/2025 COT - RSPL - Plumbing Final Passed
09/19/2025 RSBU - Building Final Passed
09/19/2025 ENGR Engineering Final Passed
09/19/2025 RSBU - Building Progress Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
MIRADOR POINT - LOT 7 START_V4.PDF DOCUMENTS VIEW
MP 7 SIC-2025-04-02_V1.PDF DOCUMENTS VIEW