Parcel: 141460070


Addresses:

7358 S DEMPSEY AV


Inspection Status: Re-inspection required

Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.

Permit Number - TC-MDP-1224-01401

Inspection Description - COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.

Inspection Status - Re-inspection required

Date Description Inspector Results Comments
07/11/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Re-inspection required 7/11/25: not ready, riser not installed, UFER not properly installed, seal all penetrations through vapor barrier, plans call for 23 circuits only 20 are present at time of inspection, pressure relief must be roughed in (plans call for it to be terminated outside of building note F on page PEI), nm sheathing must extend 1/4" into fixture at bathroom exhaust 1st floor, seal penetration throughout at top plate, smoke detector must be 3' from air registers, plans call for exterior receptacles to be 12Awg, seal sleeves at kitchen island, secure refrigerant lines in wall at kitchen in wall, bedroom 2 and 3 circuits tied together, secure nm cable 8" from box,
07/15/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Partial Pass 7/15/25 partial pass pending electrical letter
09/04/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 9.4.2025
Letter provided, upload to TDC dashboard prior to final.