Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Address NEW:
7400 S DEMPSEY AV
Apply Date:
04/22/2025
Applicant:
Celina Rodriguez
Description:
KB Home 2467 (Model master plan TC-MDP-1124-01304)

Permit Reviews

Permit Number - TC-MDP-1224-01400
Permit Status: Inspections complete
Permit Description: KB Home 2467 (Model master plan TC-MDP-1124-01304)
Start Date Submittal Complete Date Status  
04/24/2025 SITE FROM MODEL PERMIT - PRODUCTION v.1 05/01/2025 REQUIRES RESUBMIT Review Details
05/07/2025 RESTAMP - RESIDENTIAL v.1 05/12/2025 APPROVED Review Details
05/05/2025 SITE FROM MODEL PERMIT - PRODUCTION v.2 05/07/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-1224-01400
Permit Status: Inspections complete
Permit Description: KB Home 2467 (Model master plan TC-MDP-1124-01304)
Total Outstanding Activity Conditions - 5
Date Name
04/29/2025 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
04/29/2025 Post-Installed Anchor Inspection Report is required.
04/29/2025 Post-Tension Inspection Report is required.
04/29/2025 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.
12/20/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/

Conditions

Permit Number - TC-MDP-1224-01400
Permit Status: Inspections complete
Permit Description: KB Home 2467 (Model master plan TC-MDP-1124-01304)
Date Description Comments
12/20/2024 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
12/20/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-1224-01400
Permite Description: KB Home 2467 (Model master plan TC-MDP-1124-01304)
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
05/16/2025 COT - BULD - SWG Clearance N/A Not Applicable Site does not use gas
05/16/2025 COT - RSPL - Gas Pressure Test N/A Not Applicable Site does not use gas

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-1224-01400
Permit Description: KB Home 2467 (Model master plan TC-MDP-1124-01304)
Total Completed Inspections - 19
Date Description Inspector Results Comments
05/16/2025 COT - RSPL - Rough Soil Passed Passed 5/16/25 ok to backfill
05/16/2025 COT - RSPL - Sewer Passed Passed 5/16/25 ok to backfill
05/16/2025 COT - RSPL - Yard Water Line Passed Passed 5/16/25 ok to backfill
05/23/2025 COT - RSBU - Excavation/Rebar/Zoning Passed Passed 5/23/25 ok to pour concrete
05/23/2025 COT - RSBU - Preslab Passed Passed 5/23/25 ok to pour concrete
05/23/2025 COT - RSEL - Electrical Underground Passed Passed 5/23/25 ok to pour concrete
05/23/2025 COT - RSEL - Grounding/Bonding Passed Partial pass for ufer, will check connection at later date
06/17/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 6.17.25 corrections made and approved
06/17/2025 COT - RSBU - Roof Nailing Passed 6.17.25 corrections made and approved
07/16/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 7.16.25
Satisfactory corrections made
07/28/2025 COT - RSBU - Interior Shear Bracing Passed
08/14/2025 BULD - Electrical Clearance Passed Ready for temp power clearance ECO
09/17/2025 COT - RSEL - Outdoor Lighting Passed
09/17/2025 COT - RSPL - Plumbing Final Passed
09/17/2025 ENGR Engineering Final Passed Site is safe and accessible; complete in accordance with approved plans.
09/17/2025 RSBU - Building Progress Passed
09/23/2025 COT - RSEL - Electrical Final Passed
09/23/2025 COT - RSME - Mechanical Final Passed
09/23/2025 RSBU - Building Final Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
MIRADOR POINT - LOT 14 START_V2.PDF DOCUMENTS VIEW
MP 14 SIC-2025-04-22_V1.PDF DOCUMENTS VIEW