Inspection History Details
Inspection Status: Re-inspection required
Inspection History: RSBU - Building Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/17/2025 | RSBU - Building Final | Re-inspection required | 9.17.2025 Heat kit needs to marked at air handler in attic, missing outlet cover plate in attic and empty j-box needs cover, AC disconnect wiring not complete in attic, insulate hot water line at heater in garage, add stucco to flashing and communications conduit at main panel area, mark non-metallic plumbing at panel, clear rocks to 4" at weep screed and 3" clearance at AC outside, add clamp to AC whip. |
|
| 09/23/2025 | RSBU - Building Final | Passed |