Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-MDP-1123-01830
Permit Details
Apply Date:
04/25/2024
Applicant:
Celina Rodriguez
Description:
SFR BT1465-130 T22-M0011
Permit Reviews
Permit Number - TC-MDP-1123-01830
Permit Status: Inspections complete
Permit Description: SFR BT1465-130 T22-M0011
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
04/26/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 05/01/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-1123-01830
Permit Status: Inspections complete
Permit Description: SFR BT1465-130 T22-M0011
Total Outstanding Activity Conditions - 7
Date | Name |
---|---|
04/30/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
04/30/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
04/30/2024 | Post-Tension Inspection Report is required. |
04/30/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
04/30/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
11/22/2023 | THIS DOES NOT APPLY |
11/22/2023 | THIS DOES NOT APPLY |
Conditions
Permit Number - TC-MDP-1123-01830
Permit Status: Inspections complete
Permit Description: SFR BT1465-130 T22-M0011
Date | Description | Comments |
---|---|---|
11/21/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-1123-01830
Permit Description: SFR BT1465-130 T22-M0011
Total Completed Inspections - 22
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/25/2024 | COT - RSPL - Rough Soil | Passed | ||
06/25/2024 | COT - RSPL - Backwater Valve | Passed | ||
06/25/2024 | COT - RSPL - Yard Water Line | Passed | ||
07/02/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
07/02/2024 | COT - RSBU - Preslab | Passed | ||
07/02/2024 | COT - RSEL - Electrical Underground | Passed | ||
07/02/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
07/29/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | 7/29/24: Titanic Anchor bolts have been installed where excessive masa clip legs were attached to studs and not to base plate. Titan bolts installed on shear wall 11. Shot pins installed in base plate at master bathroom wall. Okay to proceed with rough-in. | |
07/29/2024 | COT - RSBU - Roof Nailing | Passed | 7/29/24: plywood sheathing has been secured to trusses in master bedroom and living room. Okay to proceed with rough-in. | |
09/23/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
09/25/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 9/25/24: All items have been corrected. Mechanical, electrical, and plumbing rough-in is complete. Okay to proceed with installation of insulation and drywall. | |
10/07/2024 | COT - RSPL - Sewer | Passed | 10/7/24: Leak at clean-out has been repaired and line is under a water test with no leaks. Okay to shade pipe and backfill trench. | |
10/11/2024 | COT - RSBU - Interior Shear Bracing | Passed | Passed. Okay to proceed with tape, texture, and paint. | |
11/20/2024 | COT - BULD - SWG Clearance | Passed | Gas valves are installed at each gas appliance location. Okay to install meter. SWG Clearance issued. | |
11/21/2024 | BULD - Electrical Clearance | Passed | Clearance for TEP ECO. 11/21/2024 | |
12/11/2024 | COT - RSEL - Outdoor Lighting | Passed | 12-11-24, outdoor lighting final approved | |
12/11/2024 | RSBU - Building Progress | Passed | ||
12/12/2024 | COT - RSEL - Electrical Final | Passed | 12-12-24, electrical final approved. | |
12/12/2024 | COT - RSME - Mechanical Final | Passed | 12-12-24, mechanical final approved. | |
12/12/2024 | ENGR Engineering Final | Passed | ||
12/16/2024 | COT - RSPL - Plumbing Final | Passed | 12/16/24 corrections have been made | |
12/16/2024 | RSBU - Building Final | Passed | 12/16/24 corrections have been made. |