Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Model Building Permit
Apply Date:
04/25/2024
Applicant:
Celina Rodriguez
Description:
SFR BT1465-130 T22-M0011

Permit Reviews

Permit Number - TC-MDP-1123-01830
Permit Status: Issued
Permit Description: SFR BT1465-130 T22-M0011
Start Date Submittal Complete Date Status  
04/26/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 05/01/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-1123-01830
Permit Status: Issued
Permit Description: SFR BT1465-130 T22-M0011
Total Outstanding Activity Conditions - 7
Date Name
04/30/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
04/30/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
04/30/2024 Post-Tension Inspection Report is required.
04/30/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
04/30/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.
11/22/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
11/22/2023 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.

Conditions

Permit Number - TC-MDP-1123-01830
Permit Status: Issued
Permit Description: SFR BT1465-130 T22-M0011
Date Description Comments
11/21/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Completed Inspections

Permit Status: Issued
Permit Number: TC-MDP-1123-01830
Permit Description: SFR BT1465-130 T22-M0011
Total Completed Inspections - 13
Date Description Inspector Results Comments
06/25/2024 COT - RSPL - Rough Soil Passed
06/25/2024 COT - RSPL - Backwater Valve Passed
06/25/2024 COT - RSPL - Yard Water Line Passed
07/02/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
07/02/2024 COT - RSBU - Preslab Passed
07/02/2024 COT - RSEL - Electrical Underground Passed
07/02/2024 COT - RSEL - Grounding/Bonding Passed
07/29/2024 COT - RSBU - Exterior Clips/Sheathing Passed 7/29/24: Titanic Anchor bolts have been installed where excessive masa clip legs were attached to studs and not to base plate. Titan bolts installed on shear wall 11. Shot pins installed in base plate at master bathroom wall. Okay to proceed with rough-in.
07/29/2024 COT - RSBU - Roof Nailing Passed 7/29/24: plywood sheathing has been secured to trusses in master bedroom and living room. Okay to proceed with rough-in.
09/23/2024 COT - RSPL - Gas Pressure Test Passed
09/25/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 9/25/24: All items have been corrected. Mechanical, electrical, and plumbing rough-in is complete. Okay to proceed with installation of insulation and drywall.
10/07/2024 COT - RSPL - Sewer Passed 10/7/24: Leak at clean-out has been repaired and line is under a water test with no leaks. Okay to shade pipe and backfill trench.
10/11/2024 COT - RSBU - Interior Shear Bracing Passed Passed. Okay to proceed with tape, texture, and paint.

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
BELLA TIERRA PHASE 3 - LOT 68 START_V1.PDF DOCUMENTS VIEW
BTIII 68 SIC-2024-04-25_V1.PDF DOCUMENTS VIEW