Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Inspections
Type:
Model Building Permit
Address NEW:
6037 E GABILAN LN
Apply Date:
10/28/2025
Applicant:
David Alcantar III
Description:
Blackhawk L022 - Etta (Model Master Plan TC-MDP-1025-00677)

Permit Reviews

Permit Number - TC-MDP-1025-00695
Permit Status: Inspections
Permit Description: Blackhawk L022 - Etta (Model Master Plan TC-MDP-1025-00677)
Start Date Submittal Complete Date Status  
11/25/2025 SITE FROM MODEL PERMIT - SUBDIVISION v.1 11/28/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-1025-00695
Permit Status: Inspections
Permit Description: Blackhawk L022 - Etta (Model Master Plan TC-MDP-1025-00677)
Total Outstanding Activity Conditions - 5
Date Name
10/29/2025 Submit the Air Leakage & Duct Tightness Test Report completed by an Approved Special Inspector prior to Final Inspections.
10/29/2025 Post-Tension Inspection Report is required.
10/29/2025 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
11/25/2025 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
11/25/2025 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.

Conditions

Permit Number - TC-MDP-1025-00695
Permit Status: Inspections
Permit Description: Blackhawk L022 - Etta (Model Master Plan TC-MDP-1025-00677)
Date Description Comments
10/29/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
10/29/2025 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Inspections
Permit Number: TC-MDP-1025-00695
Permite Description: Blackhawk L022 - Etta (Model Master Plan TC-MDP-1025-00677)
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
12/29/2025 COT - RSEL - Electrical Underground N/A Partial Pass
01/12/2026 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing N/A Re-inspection required 01/12/2026
Add flat 2x4 on gable end diagonal bracing that exceeds 6’ on northside upstairs, add 6 nails to diagonal bracing on southside gable end, add anchor bolt at marked location and RSP4 on west wall.
03/11/2026 ENGR Engineering Final N/A Not Ready This permit Is for dwellings, not offices.
I recommend you Resubmit TC-COM-1225-02211 call in inspection on that permit.
After it is converted back to an SFR, it can be reinspected under the MDP permit.
ICC A117.1 requires an Accessible Route. The Landing in front of the Doorway without the step is too steep to comply. The threshold for the doorway of this route should be 1/4”. It can be it to 1/2” if it is beveled.

Completed Inspections

Permit Status: Inspections
Permit Number: TC-MDP-1025-00695
Permit Description: Blackhawk L022 - Etta (Model Master Plan TC-MDP-1025-00677)
Total Completed Inspections - 18
Date Description Inspector Results Comments
12/23/2025 COT - RSPL - Rough Soil Passed 12/23/2025
Approved. All fixtures in clean trench with slope holding under test - okay to backfill with shading materials.
12/23/2025 COT - RSPL - Sewer Passed 12/23/2025
Approved and holding under to HCS with green tracer - okay to backfill with shading materials.
12/23/2025 COT - RSPL - Yard Water Line Passed 12/23/2025
Approved, aquaPEX in trench with blue tracer to meter holding under test - okay to backfill with shading materials.
12/29/2025 COT - RSBU - Excavation/Rebar/Zoning Passed 12/29/2025
Approved per site plan.
12/29/2025 COT - RSBU - Preslab Passed 12/29/2025
Approved per plan, verified LSTHD8 rebar added and masa clips to rear column. Okay for concrete placement.
01/12/2026 COT - RSBU - Roof Nailing Passed 01/12/2026
Approved per plan and truss calcs.
01/16/2026 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 01/16/2026
Corrections made to 1/12/26 inspection.
01/26/2026 BULD - Electrical Clearance Passed Ready for temp power CLEARANCE ECO
01/27/2026 COT - RSPL - Gas Pressure Test Passed
01/27/2026 RSBU - Building Progress Passed
01/29/2026 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 1/29/26 passed
02/02/2026 COT - RSBU - Interior Shear Bracing Passed
03/03/2026 COT - BULD - SWG Clearance Passed 03/03/2026
Approved clearance for SWG.
03/11/2026 COT - RSEL - Outdoor Lighting Passed
03/11/2026 COT - RSPL - Plumbing Final Passed
03/20/2026 COT - RSEL - Electrical Final Passed 3/20/2026
All corrections are to prior inspection.
03/20/2026 COT - RSME - Mechanical Final Passed 3/20/2026
All corrections are to prior inspection.
03/20/2026 RSBU - Building Final Passed 3/20/2026
All corrections are to prior inspection.

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW
BLACKHAWK - LOT 290 - BLESSED_V1.PDF DOCUMENTS VIEW
BLACKHAWK - LOT 290 - SIC-2025-11-24_V1.PDF DOCUMENTS VIEW