Permit: TC-MDP-1025-00633
Permit Details
Status:
Inspections
Type:
Model Building Permit
Address:
6216 S SPRUCE GOOSE AV
Address NEW:
6216 S SPRUCE GOOSE AV
Apply Date:
05/07/2026
Applicant:
Celina Rodriguez
Description:
Cielo Reserve 1262 SFR (Model master plan TC-MDP-0525-00297)
Permit Reviews
Permit Number - TC-MDP-1025-00633
Permit Status: Inspections
Permit Description: Cielo Reserve 1262 SFR (Model master plan TC-MDP-0525-00297)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/21/2026 | SPECIAL INSPECTION REVIEW v.1 | 08/24/2026 | APPROVED |
| 05/13/2026 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 05/20/2026 | APPROVED |
Conditions
Permit Number - TC-MDP-1025-00633
Permit Status: Inspections
Permit Description: Cielo Reserve 1262 SFR (Model master plan TC-MDP-0525-00297)
| Date | Description | Comments |
|---|---|---|
| 05/14/2026 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 10/02/2025 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 05/14/2026 | Post-Installed Anchor Inspection Report is required. | |
| 10/02/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 10/02/2025 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TC-MDP-1025-00633
Permite Description: Cielo Reserve 1262 SFR (Model master plan TC-MDP-0525-00297)
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/21/2026 | ENGR Engineering Final | N/A | Not Ready | South side yard and backyard will not drain correctly as currently graded. The lot is a B lot. There is one drain block in the rear but it it at least 1 course too high to drain correctly. It should be lowered and a swale from the south side yard should be formed to it for functioning drainage. The grade/landscaping on the others side drain block of the screen wall will also need to be adjusted. -Outstanding conditions also need to be satisfied prior to final inspections. |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-MDP-1025-00633
Permit Description: Cielo Reserve 1262 SFR (Model master plan TC-MDP-0525-00297)
Total Completed Inspections - 20
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/02/2026 | COT - RSPL - Rough Soil | Passed | ||
| 06/02/2026 | COT - RSPL - Sewer | Passed | ||
| 06/02/2026 | COT - RSPL - Yard Water Line | Passed | 6.2.26 Approved |
|
| 06/02/2026 | COT - RSPL - Backwater Valve | Passed | ||
| 06/08/2026 | COT - RSBU - Preslab | Passed | ||
| 06/08/2026 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 06/08/2026 | COT - RSEL - Electrical Underground | Passed | ||
| 06/15/2026 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 06/15/2026 | COT - RSBU - Roof Nailing | Passed | ||
| 06/29/2026 | COT - RSPL - Gas Pressure Test | Passed | ||
| 06/29/2026 | RSBU - Building Progress | Passed | ||
| 07/01/2026 | BULD - Electrical Clearance | Passed | 07/01/2026 Clearance TEP ECO. |
|
| 07/02/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 07/09/2026 | COT - RSBU - Interior Shear Bracing | Passed | 7-9-2026 approved ready for tape. | |
| 08/21/2026 | COT - BULD - SWG Clearance | Passed | ||
| 08/21/2026 | COT - RSEL - Outdoor Lighting | Passed | ||
| 08/21/2026 | COT - RSPL - Plumbing Final | Passed | 8-21-26 Plumbing final approved | |
| 08/25/2026 | COT - RSEL - Electrical Final | Passed | 8-25-26 all items have been corrected mechanical final approved | |
| 08/25/2026 | COT - RSME - Mechanical Final | Passed | 8-25-26 all items have been corrected mechanical final approved | |
| 08/25/2026 | RSBU - Building Final | Passed | 8-25-26 all items have been corrected mechanical final approved, also conditions have been satisfied |
Scheduled Inspections
Scheduled Inspections - TC-MDP-1025-00633
Status: Inspections
Description: Cielo Reserve 1262 SFR (Model master plan TC-MDP-0525-00297)
| Scheduled Date | Description | Entered By | Entered Date |
|---|---|---|---|
| 08/27/2026 | ENGR Engineering Final | Scheduled |