Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Inspection Status: Re-inspection required

Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.

Date Description Inspector Results Comments
06/29/2026 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Re-inspection required 06/29/2026
Fire caulk top plate penetrations throughout, add steel nail plates as marked to 8AWG wire within 1.25" to stud face and tape torn sheathing in garage, add stud shoes to over-notched 2x6 in laundry room, move eletrical receptacle in bedroom within 6’ of door measured along floor line of wall.
06/30/2026 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Re-inspection required (with fee) 6/30/26: Sewer line damaged. Rescheduled inspection once repair is made. Pressure test required. Damaged sheathing at EV has to be repaired, properly insulate water lines in unconditioned space, over notched studs at laundry room have not been addressed, nail plates required in laundry room and bedrooms, h2.5 at bedroom south needs nails, make up wires at master bedroom receptacle.
07/02/2026 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed