Inspection Status: Re-inspection required

Inspection History: RSBU - Building Final 

Date Description Inspector Results Comments
08/21/2026 RSBU - Building Final  Re-inspection required 8-21-26 receptacle in cabinet above microwave needs to be properly installed and plated* receptacle below kitchen sink needs to be properly installed and plated* 3 inch clearance is required around condensing pad.
08/25/2026 RSBU - Building Final  Passed 8-25-26 all items have been corrected mechanical final approved, also conditions have been satisfied