Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Inspection Status: Not Ready

Inspection History: ENGR Engineering Final

Date Description Inspector Results Comments
08/21/2026 ENGR Engineering Final Not Ready South side yard and backyard will not drain correctly as currently graded. The lot is a B lot. There is one drain block in the rear but it it at least 1 course too high to drain correctly. It should be lowered and a swale from the south side yard should be formed to it for functioning drainage. The grade/landscaping on the others side drain block of the screen wall will also need to be adjusted.
-Outstanding conditions also need to be satisfied prior to final inspections.
ENGR Engineering Final Scheduled