Permit: TC-MDP-1025-00624
Permit Details
Status:
Inspections Complete
Type:
Model Building Permit
Address:
2166 E SUPERSONIC ST
Address NEW:
2166 E SUPERSONIC ST
Apply Date:
03/30/2026
Applicant:
Celina Rodriguez
Description:
Cielo Reserve 1383 SFR (Model master plan TC-MDP-0525-00298)
Permit Reviews
Permit Number - TC-MDP-1025-00624
Permit Status: Inspections complete
Permit Description: Cielo Reserve 1383 SFR (Model master plan TC-MDP-0525-00298)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/28/2026 | SPECIAL INSPECTION REVIEW v.1 | 07/29/2026 | REQUIRES RESUBMIT |
| 04/02/2026 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 04/13/2026 | APPROVED |
| 07/29/2026 | SPECIAL INSPECTION REVIEW v.2 | 07/30/2026 | APPROVED |
Conditions
Permit Number - TC-MDP-1025-00624
Permit Status: Inspections complete
Permit Description: Cielo Reserve 1383 SFR (Model master plan TC-MDP-0525-00298)
| Date | Description | Comments |
|---|---|---|
| 04/03/2026 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 10/02/2025 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 04/03/2026 | Post-Installed Anchor Inspection Report is required. | |
| 10/02/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 10/02/2025 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-1025-00624
Permite Description: Cielo Reserve 1383 SFR (Model master plan TC-MDP-0525-00298)
Total Outstanding Inspections - 6
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/29/2026 | COT - RSEL - Electrical Underground | N/A | Not Applicable | |
| 04/29/2026 | COT - RSBU - Preslab | N/A | Re-inspection required | 4/29/2026 Loose pad in garage requires compaction. |
| 04/29/2026 | COT - RSBU - Excavation/Rebar/Zoning | N/A | Re-inspection required | 4/29/2026 Loose pad in garage requires compaction. |
| 07/28/2026 | COT - RSME - Mechanical Final | N/A | Not Ready | |
| 07/28/2026 | COT - RSPL - Plumbing Final | N/A | Not Ready | |
| 07/28/2026 | RSBU - Building Final | N/A | Not Ready |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-1025-00624
Permit Description: Cielo Reserve 1383 SFR (Model master plan TC-MDP-0525-00298)
Total Completed Inspections - 19
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/22/2026 | COT - RSPL - Rough Soil | Passed | 04/22/2026 Holding under test. Okay to backfill with shading material. |
|
| 04/22/2026 | COT - RSPL - Sewer | Passed | 04/22/2026 Holding under test to HCS. Okay to backfill with shading material. |
|
| 04/22/2026 | COT - RSPL - Yard Water Line | Passed | 04/22/2026 Holding under test to meter. Okay to backfill with shading material. |
|
| 04/30/2026 | COT - RSBU - Preslab | Passed | 04/30/2026 Corrections made. Okay for concrete placement. |
|
| 04/30/2026 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 04/30/2026 Corrections made. Okay for concrete placement. |
|
| 05/06/2026 | COT - RSBU - Roof Nailing | Passed | 5-6-26: okay to dry-in roof. | |
| 05/07/2026 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | corrections made | |
| 05/11/2026 | BULD - Electrical Clearance | Passed | 05/11/2026 Clearance TEP ECO. |
|
| 05/26/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 05/26/2026 | COT - RSPL - Gas Pressure Test | Passed | ||
| 05/26/2026 | RSBU - Building Progress | Passed | ||
| 06/05/2026 | COT - RSBU - Interior Shear Bracing | Passed | Approved | |
| 07/09/2026 | COT - BULD - SWG Clearance | Passed | 7-9-2026 SWG Clearance approved. | |
| 07/24/2026 | COT - RSEL - Electrical Final | Passed | ||
| 07/24/2026 | COT - RSEL - Outdoor Lighting | Passed | ||
| 07/29/2026 | COT - RSME - Mechanical Final | Passed | 07/29/2026 All corrections made. |
|
| 07/29/2026 | COT - RSPL - Plumbing Final | Passed | 07/29/2026 All corrections made. |
|
| 07/30/2026 | ENGR Engineering Final | Passed | ||
| 07/30/2026 | RSBU - Building Final | Passed | 07/30/2026 Remaining conditions cert submitted and uploaded, see attachment. |