Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSPL - Plumbing Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/24/2026 | COT - RSPL - Plumbing Final | Re-inspection required | 7/24/2026 Partial pass. Level out condenser unit. Provide 3” clearance around pad. Provide post tension tag at hose bib. Currently no running water. Threshold needs to be ADA compliant at garage. Ensure all conditions are met prior to building final. | |
| COT - RSPL - Plumbing Final | Not Ready | |||
| 07/29/2026 | COT - RSPL - Plumbing Final | Passed | 07/29/2026 All corrections made. |