Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/24/2026 | ENGR Engineering Final | Not Ready | 7/24/26 -HCS Cap collar is not glued to clean out in driveway. See attached image. -Plot Plan states Accessible Route conforms to 2017 ICC A117.1 sections 402 and 403. The Accessible Route is through the garage because there is step at front door. Section 403 states that changes in level shall comply with Section 303. The threshold in the garage entryway does not comply with 303.2 and 303.3. Threshhold is over 1/2", and is not beveled. See attached image. -There are unsatisfied conditions on the permit that need to be satisfied prior to final inspection. |
|
| 07/28/2026 | ENGR Engineering Final | Not Ready | HCS Cap is not fixed. Threshold at Accessible Route Entryway does not comply. Outstanding conditions need to be satisfied prior to final inspection: -Sewer release -Post–installed anchor inspection report -Post tension slab -Concrete installation |
|
| 07/30/2026 | ENGR Engineering Final | Passed |