Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Model Building Permit
Address NEW:
4711 E JULIAN WASH DR
Apply Date:
11/08/2024
Applicant:
Dana Petty
Description:
SFR MERI213021 T21-M0065 (Model master plan TC-MDP-0223-00546)

Permit Reviews

Permit Number - TC-MDP-1024-01234
Permit Status: Complete
Permit Description: SFR MERI213021 T21-M0065 (Model master plan TC-MDP-0223-00546)
Start Date Submittal Complete Date Status  
07/24/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 07/30/2025 APPROVED Review Details
11/15/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 12/05/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-1024-01234
Permit Status: Complete
Permit Description: SFR MERI213021 T21-M0065 (Model master plan TC-MDP-0223-00546)
Date Description Comments
10/21/2024 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
11/18/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
11/18/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
11/18/2024 Post-Tension Inspection Report is required.
10/21/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
10/21/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
11/18/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
11/18/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-1024-01234
Permite Description: SFR MERI213021 T21-M0065 (Model master plan TC-MDP-0223-00546)
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
06/02/2025 COT - RSBU - Roof Nailing N/A Re-inspection required 6-2-25: no plans on site. Arrived on site at approximately 6:50, contacted contractor at 7:04 and left at 7:23

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-1024-01234
Permit Description: SFR MERI213021 T21-M0065 (Model master plan TC-MDP-0223-00546)
Total Completed Inspections - 22
Date Description Inspector Results Comments
05/09/2025 COT - RSPL - Backwater Valve Passed Okay to backfill. Shading required. 5/9/2025
05/09/2025 COT - RSPL - Rough Soil Passed Okay to backfill. Shading required. 5/9/2025
05/09/2025 COT - RSPL - Sewer Passed Okay to backfill. Shading required. 5/9/2025
05/09/2025 COT - RSPL - Yard Water Line Passed Okay to backfill. Shading required. 5/9/2025
05/20/2025 COT - RSBU - Preslab Passed 5/20/25 Setbacks verified as per plan. Pre slab verified. Reinforcement verified. Proper compaction, footings and clips on site. Ready to pour concrete.
05/20/2025 COT - RSBU - Excavation/Rebar/Zoning Passed 5/20/25 Setbacks verified as per plan. Pre slab verified. Reinforcement verified. Proper compaction, footings and clips on site. Ready to pour concrete.
05/20/2025 COT - RSEL - Electrical Underground Passed 5/20/25 Setbacks verified as per plan. Pre slab verified. Reinforcement verified. Proper compaction, footings and clips on site. Ready to pour concrete.
06/10/2025 COT - RSBU - Roof Nailing Passed 6-10-25: roof nailing approved
06/17/2025 COT - RSPL - Gas Pressure Test Passed
06/20/2025 BULD - Electrical Clearance Passed Clearance for TEP ECO. 6/20/2025
06/20/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed All corrections were made. 6/20/2025
06/20/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed All corrections were made. No other items occurred . 6/20/2025
06/20/2025 COT - RSEL - Grounding/Bonding Passed
07/03/2025 COT - RSBU - Interior Shear Bracing Passed
08/11/2025 COT - BULD - SWG Clearance Passed 8.11.25
Approved
08/14/2025 COT - RSEL - Electrical Final Passed
08/14/2025 COT - RSEL - Outdoor Lighting Passed
08/14/2025 COT - RSME - Mechanical Final Passed
08/14/2025 COT - RSPL - Plumbing Final Passed
08/14/2025 ENGR Engineering Final Passed
08/14/2025 RSBU - Building Final Passed
08/14/2025 RSBU - Building Progress Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
241720 VALENCIA CROSSING LOT 116 PT-2025-07-23_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 116 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 116 SPECIAL INSPECTION CERTIFICATE-2024-11-08_V1.PDF DOCUMENTS VIEW