Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Inspection Status: Re-inspection required

Inspection History: COT - RSBU - Exterior/Interior Clips/Sheathing/Framing

Date Description Inspector Results Comments
06/02/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Re-inspection required 6-2-25: no plans on site. Arrived on site at approximately 6:50, contacted contractor at 7:04 and left at 7:23
06/03/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Re-inspection required 6-3-25: add nails to CS20 straps on south & north sides, add nails to CS20 strapping at posts to beams- 10 nails above /below interconnecting points, all 1/2" shear wall anchors require 3x3" washer plates, add shot pins at marked location, add nails throughout edge/joints at rim board, and nails where overpenetrated sheathing more than 1/8".STOPPED INSPECTION-ADDITIONAL ITEMS MAY BE ADDED.
06/06/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Re-inspection required 6-6-25: add nails to shear walls where over penetrated (southeast area) and at marked areas-see shear wall schedule P2, P4. Add nails to loose shear wall at upstairs west side and nails to sill plate to decking at marked locations, add CS20 with 10 nails above/below interconnecting points on northwest side.Add anchor bolts and 3x3" washer plates to porch shear walls-See Detail S4-Note A for spacing requirements, missing gable bracing at garage& porch -See SD-3-Detail 7. Provide truss calculations on reinspect.
06/10/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Partial Pass 6-10-25: missing anchor bolts/3x3 washer at garage shear wall-this will be verified at intermediates. Okay to continue with construction.
06/17/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Re-inspection required 6-2-25: no plans on site. Arrived on site at approximately 6:50, contacted contractor at 7:04 and left at 7:23
6-3-25: add nails to CS20 straps on south & north sides, add nails to CS20 strapping at posts to beams- 10 nails above /below interconnecting points, all 1/2" shear wall anchors require 3x3" washer plates, add shot pins at marked location, add nails throughout edge/joints at rim board, and nails where overpenetrated sheathing more than 1/8".STOPPED INSPECTION-ADDITIONAL ITEMS MAY BE ADDED.
6-6-25: add nails to shear walls where over penetrated (southeast area) and at marked areas-see shear wall schedule P2, P4. Add nails to loose shear wall at upstairs west side and nails to sill plate to decking at marked locations, add CS20 with 10 nails above/below interconnecting points on northwest side.Add anchor bolts and 3x3" washer plates to porch shear walls-See Detail S4-Note A for spacing requirements, missing gable bracing at garage& porch -See SD-3-Detail 7. Provide truss calculations on reinspect.
6-10-25: missing anchor bolts/3x3 washer at garage shear wall-this will be verified at intermediates. Okay to continue with construction.
6/17/25: per previous notes, please expose sill plate behind thermoply to verify washer plates at garage shear wall.
06/20/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed All corrections were made. 6/20/2025