Permit: TC-MDP-1024-01190
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
4707 E JULIAN WASH DR
Address NEW:
4707 E JULIAN WASH DR
Apply Date:
11/08/2024
Applicant:
Dana Petty
Description:
SFR MERI132021 T21-M0062 (Model master plan TC-MDP-0223-00478)
Permit Reviews
Permit Number - TC-MDP-1024-01190
Permit Status: Complete
Permit Description: SFR MERI132021 T21-M0062 (Model master plan TC-MDP-0223-00478)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 11/14/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 12/03/2024 | APPROVED |
| 03/21/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 06/10/2025 | APPROVED |
| 07/24/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 07/28/2025 | APPROVED |
Conditions
Permit Number - TC-MDP-1024-01190
Permit Status: Complete
Permit Description: SFR MERI132021 T21-M0062 (Model master plan TC-MDP-0223-00478)
| Date | Description | Comments |
|---|---|---|
| 10/14/2024 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 11/15/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 11/15/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 11/15/2024 | Post-Tension Inspection Report is required. | |
| 10/14/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 10/14/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ | |
| 11/15/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
| 11/15/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-1024-01190
Permite Description: SFR MERI132021 T21-M0062 (Model master plan TC-MDP-0223-00478)
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/02/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | N/A | Re-inspection required | 6-2-25: no plans on site. Arrived on site at approximately 6:50, contacted contractor at 7:04 and left at 7:23 |
| 06/02/2025 | COT - RSBU - Roof Nailing | N/A | Re-inspection required | 6-2-25: no plans on site. Arrived on site at approximately 6:50, contacted contractor at 7:04 and left at 7:23 |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-1024-01190
Permit Description: SFR MERI132021 T21-M0062 (Model master plan TC-MDP-0223-00478)
Total Completed Inspections - 22
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/09/2025 | COT - RSPL - Yard Water Line | Passed | Okay to backfill. Shading required. 5/9/2025 | |
| 05/09/2025 | COT - RSPL - Sewer | Passed | Okay to backfill. Shading required. 5/9/2025 | |
| 05/09/2025 | COT - RSPL - Rough Soil | Passed | Okay to backfill. Shading required. 5/9/2025 | |
| 05/09/2025 | COT - RSPL - Backwater Valve | Passed | Okay to backfill. Shading required. 5/9/2025 | |
| 05/20/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 5-20-25, excavation/rebar/setbacks verified per approved plans. Okay to pour concrete | |
| 05/20/2025 | COT - RSBU - Preslab | Passed | 5/20/25 Setbacks verified as per plan. Proper compaction, footings and clips on site. Ready to pour concrete. | |
| 05/20/2025 | COT - RSEL - Electrical Underground | Passed | 5/20/25 Setbacks verified as per plan. Proper compaction, footings and clips on site. Ready to pour concrete. | |
| 06/03/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 6-3-25: exterior clips/sheathing approved. Okay to continue with construction. | |
| 06/03/2025 | COT - RSBU - Roof Nailing | Passed | 6-3-25: roof nailing approved. | |
| 06/16/2025 | COT - RSPL - Gas Pressure Test | Passed | ||
| 06/20/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | All corrections were made. 6/20/2025 | |
| 06/23/2025 | BULD - Electrical Clearance | Passed | Clearance for TEP ECO. 6/23/2025 | |
| 07/03/2025 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 07/03/2025 | COT - RSEL - Grounding/Bonding | Passed | ||
| 08/06/2025 | COT - BULD - SWG Clearance | Passed | Clearance for Southwest Gas. 8/6/2025 | |
| 08/13/2025 | COT - RSEL - Electrical Final | Passed | ||
| 08/13/2025 | COT - RSEL - Outdoor Lighting | Passed | ||
| 08/13/2025 | COT - RSME - Mechanical Final | Passed | ||
| 08/13/2025 | COT - RSPL - Plumbing Final | Passed | ||
| 08/13/2025 | RSBU - Building Final | Passed | ||
| 08/13/2025 | RSBU - Building Progress | Passed | ||
| 08/14/2025 | ENGR Engineering Final | Passed |