Permit: TC-MDP-1023-01667
Permit Details
Status:
Inspections Complete
Type:
Model Building Permit
Address:
9720 E GRAY HAWK DR
Address NEW:
9720 E GRAY HAWK DR
Apply Date:
10/20/2023
Applicant:
Helen Ormsby
Description:
Casas del Cerrito 3542 Model Plan
Permit Reviews
Permit Number - TC-MDP-1023-01667
Permit Status: Inspections complete
Permit Description: Casas del Cerrito 3542 Model Plan
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/06/2024 | SITE FROM MODEL PERMIT - SUBDIVISION v.2 | 02/13/2024 | APPROVED |
| 10/20/2023 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 10/30/2023 | REQUIRES RESUBMIT |
| 06/14/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 06/17/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-1023-01667
Permit Status: Inspections complete
Permit Description: Casas del Cerrito 3542 Model Plan
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 06/17/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
| 10/18/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
Conditions
Permit Number - TC-MDP-1023-01667
Permit Status: Inspections complete
Permit Description: Casas del Cerrito 3542 Model Plan
| Date | Description | Comments |
|---|---|---|
| 10/20/2023 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 06/17/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 06/17/2024 | Post-Tension Inspection Report is required. | |
| 09/11/2023 | Post-Tension Inspection Report is required. | |
| 06/17/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 08/24/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 10/18/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 10/20/2023 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
| 06/17/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. | |
| 09/11/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-1023-01667
Permite Description: Casas del Cerrito 3542 Model Plan
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/26/2024 | COT - RSEL - Grounding/Bonding | N/A | Not Applicable | |
| 05/20/2024 | RSBU - Building Progress | N/A | Not Applicable | |
| 07/05/2024 | ENGR Engineering Final | N/A | Not Ready | The side gate for this property has not been installed at this time and will need to be installed prior to the release of the site. The drainage swale for the east side of the property from the backyard to the front yard has been dug too deep and there are vertical edges along the length at the various locations between the backyard gate and the north east corner of the house. Ensure that all drainage patterns for the site are completed per the approved plans and that there are no steep grades that may be considered a safety issue. Reschedule this inspection for the first part of next week once all work has been completed. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-1023-01667
Permit Description: Casas del Cerrito 3542 Model Plan
Total Completed Inspections - 19
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/23/2024 | COT - RSPL - Sewer | Passed | ||
| 02/23/2024 | COT - RSPL - Yard Water Line | Passed | ||
| 03/19/2024 | COT - RSPL - Rough Soil | Passed | ||
| 03/26/2024 | BULD - Electrical Clearance | Passed | ||
| 03/26/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 03/26/2024 | COT - RSBU - Preslab | Passed | ||
| 03/26/2024 | COT - RSEL - Electrical Underground | Passed | ||
| 04/19/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 04/19/2024 | COT - RSBU - Roof Nailing | Passed | ||
| 05/08/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Mechanical, electrical, and plumbing rough-in is complete and per plans. Okay to proceed with installation of insulation and drywall. | |
| 05/08/2024 | COT - RSPL - Gas Pressure Test | Passed | Gas lines are under 15# of compressed air without any leaks. Okay to proceed. | |
| 05/20/2024 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 06/25/2024 | COT - BULD - SWG Clearance | Passed | SWG for meter only | |
| 07/03/2024 | COT - RSME - Mechanical Final | Passed | ||
| 07/03/2024 | COT - RSEL - Outdoor Lighting | Passed | Outdoor lighting is properly installed and operational per the plan. | |
| 07/09/2024 | COT - RSEL - Electrical Final | Passed | ||
| 07/10/2024 | ENGR Engineering Final | Passed | ||
| 07/10/2024 | RSBU - Building Final | Passed | 7/10/24: clean outs have been cut to grade, romex pieces have been removed from inside electrical panel, and dead front has been corrected. All mechanical, electrical, and plumbing fixtures are installed and fully operational. Okay to issue Certificate of Occupancy once all other departments have completed their inspections. | |
| 07/10/2024 | COT - RSPL - Plumbing Final | Passed | 7/10/24: clean outs have been cut to grade, romex pieces have been removed from inside electrical panel, and dead front has been corrected. All mechanical, electrical, and plumbing fixtures are installed and fully operational. Okay to issue Certificate of Occupancy once all other departments have completed their inspections. |