Inspection Status: Re-inspection required
Inspection History: RSBU - Building Final
| Date |
Description |
Inspector |
Results |
Comments |
| 07/03/2024 |
RSBU - Building Final |
|
Re-inspection required |
Mechanical equipment is installed and operational. Dead front on electrical panel needs to be properly installed so breakers are aligned with edge of opening. All romex wire sleeves used for labeling circuits must be removed from inside of electrical panel. Clean-outs need to be cut down to grade. |
| 07/10/2024 |
RSBU - Building Final |
|
Passed |
7/10/24: clean outs have been cut to grade, romex pieces have been removed from inside electrical panel, and dead front has been corrected. All mechanical, electrical, and plumbing fixtures are installed and fully operational. Okay to issue Certificate of Occupancy once all other departments have completed their inspections. |