Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Re-inspection required
Inspection History: COT - RSEL - Electrical Final
| Date |
Description |
Inspector |
Results |
Comments |
| 07/03/2024 |
COT - RSEL - Electrical Final |
|
Re-inspection required |
Mechanical equipment is installed and operational. Dead front on electrical panel needs to be properly installed so breakers are aligned with edge of opening. All romex wire sleeves used for labeling circuits must be removed from inside of electrical panel. Clean-outs need to be cut down to grade. |
| 07/09/2024 |
COT - RSEL - Electrical Final |
|
Passed |
|