Permit: TC-MDP-0923-01567
Permit Details
Status:
Inspections Complete
Type:
Model Building Permit
Address:
4566 S FREMONT AV UNIT 1
Address NEW:
4566 S FREMONT AV UNIT 1
Apply Date:
10/05/2023
Applicant:
Abraham Andraux
Description:
GRANDE DUPLEX MODEL PLAN SET
Permit Reviews
Permit Number - TC-MDP-0923-01567
Permit Status: Inspections complete
Permit Description: GRANDE DUPLEX MODEL PLAN SET
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 12/29/2023 | SITE FROM MODEL PERMIT - SUBDIVISION v.3 | 01/22/2024 | REQUIRES RESUBMIT |
| 11/03/2023 | SITE FROM MODEL PERMIT - SUBDIVISION v.2 | 11/13/2023 | REQUIRES RESUBMIT |
| 06/06/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 06/07/2024 | APPROVED |
| 02/29/2024 | SITE FROM MODEL PERMIT - SUBDIVISION v.4 | 03/19/2024 | APPROVED |
| 10/05/2023 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 10/11/2023 | REQUIRES RESUBMIT |
| 03/19/2024 | RESTAMP - RESIDENTIAL v.1 | 03/25/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0923-01567
Permit Status: Inspections complete
Permit Description: GRANDE DUPLEX MODEL PLAN SET
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 11/04/2025 | Submit the Air Leakage & Duct Tightness Test Report completed by an Approved Special Inspector prior to Final Inspections. |
| 11/04/2025 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ |
Conditions
Permit Number - TC-MDP-0923-01567
Permit Status: Inspections complete
Permit Description: GRANDE DUPLEX MODEL PLAN SET
| Date | Description | Comments |
|---|---|---|
| 03/14/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 06/02/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 03/14/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0923-01567
Permite Description: GRANDE DUPLEX MODEL PLAN SET
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/02/2025 | COT - RSEL - Electrical Underground | N/A | Not Applicable | |
| 01/02/2025 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
| 01/02/2025 | COT - RSPL - Gas Pressure Test | N/A | Not Applicable |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0923-01567
Permit Description: GRANDE DUPLEX MODEL PLAN SET
Total Completed Inspections - 19
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/14/2024 | COT - RSPL - Rough Soil | Passed | 5/14/24: plumbing underground per plans ok to proceed. Shading required | |
| 05/20/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 5/16/24: canceled per Carlos 5/20/24: reinforcement per plan ok to proceed. |
|
| 05/20/2024 | COT - RSBU - Preslab and floodplain | Passed | 5/16/24: canceled per Carlos 5/20/24: reinforcement per plan ok to proceed. |
|
| 06/07/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 06/07/2024 | COT - RSBU - Roof Nailing | Passed | ||
| 12/05/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 01/02/2025 | BULD - Electrical Clearance | Passed | TEP Clearance code: ECO units 1 and 2. | |
| 01/02/2025 | COT - RSBU - Interior Shear Bracing | Passed | 6/5/24: firewall in between units passed. Pending both units on exterior of wall. 6/6/24: firewall in between units passed( fastened per schedule and taped). Pending both units on exterior of wall. 1/02/2025 Passed. |
|
| 01/02/2025 | COT - RSEL - Grounding/Bonding | Passed | ||
| 04/14/2025 | COT - RSPL - Yard Water Line | Passed | ||
| 04/14/2025 | COT - RSPL - Sewer | Passed | 4/9/25: Canceled by Abraham 4/10/25: Sewer tap per plans and under pressure. Ok to backfill 30' run from sewer tap. 4/14/25: Sewer connection to home approved and under test. Ok to backfill. Shading required |
|
| 04/14/2025 | COT - RSPL - Backwater Valve | Passed | ||
| 04/14/2025 | RSBU - Building Progress | Passed | ||
| 08/20/2025 | COT - RSEL - Outdoor Lighting | Passed | 8-20-25: outdoor lighting approved. | |
| 09/26/2025 | COT - RSEL - Electrical Final | Passed | 9/26/25 corrections made | |
| 09/26/2025 | COT - RSME - Mechanical Final | Passed | 9/26/25 corrections made | |
| 09/26/2025 | COT - RSPL - Plumbing Final | Passed | 9/26/25 corrections made | |
| 09/26/2025 | ENGR Engineering Final | Passed | Site is safe and accessible, completed in accordance with approved plans. | |
| 09/26/2025 | RSBU - Building Final | Passed | 9/26/25 corrections made |