Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Inspection Status: Re-inspection required

Inspection History: COT - RSME - Mechanical Final 

Date Description Inspector Results Comments
08/20/2025 COT - RSME - Mechanical Final  Re-inspection required 8-20-25: write " non metallic plumbing " inside main panel, missing EV charger breaker, install elbow on all condensation lines, paint all exterior pvc/abs, lower thermostat height unit 1 to 48" o.c., cut all cleanouts located on east side to grade and install caps on those that are missing.
09/26/2025 COT - RSME - Mechanical Final  Passed 9/26/25 corrections made