Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Apply Date:
09/08/2023
Applicant:
Amy Stokes, Operations Accountant
Description:
SFR RKF55C T21-M0085

Permit Reviews

Permit Number - TC-MDP-0923-01475
Permit Status: Inspections complete
Permit Description: SFR RKF55C T21-M0085
Start Date Submittal Complete Date Status  
01/29/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 01/29/2024 APPROVED Review Details
09/08/2023 SITE FROM MODEL PERMIT - PRODUCTION v.1 09/15/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0923-01475
Permit Status: Inspections complete
Permit Description: SFR RKF55C T21-M0085
Total Outstanding Activity Conditions - 6
Date Name
08/08/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.
09/08/2023 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
09/08/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
09/08/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
09/08/2023 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
09/11/2023 Post-Tension Inspection Report is required.

Conditions

Permit Number - TC-MDP-0923-01475
Permit Status: Inspections complete
Permit Description: SFR RKF55C T21-M0085
Date Description Comments
09/18/2023 The Contractor you have added to your permit cannot be verified. Please contact staff to have the ROC number added to the account.
09/01/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0923-01475
Permite Description: SFR RKF55C T21-M0085
Total Outstanding Inspections - 4
Last Inspection Date Description Inspector Results Comments
10/17/2024 COT - RSEL - Electrical Final N/A Re-inspection required 10-17-24, missing door bell, thermostat heights in kitchen and two bedrooms not installed per approved plans, missing arch fault circuit in laundry, main water line under repaired-requires verification of proper operation, missing bonding at gas line.
10/17/2024 COT - RSME - Mechanical Final N/A Re-inspection required 10-17-24, missing door bell, thermostat heights in kitchen and two bedrooms not installed per approved plans, missing arch fault circuit in laundry, main water line under repaired-requires verification of proper operation, missing bonding at gas line.
10/17/2024 COT - RSPL - Plumbing Final N/A Re-inspection required 10-17-24, missing door bell, thermostat heights in kitchen and two bedrooms not installed per approved plans, missing arch fault circuit in laundry, main water line under repaired-requires verification of proper operation, missing bonding at gas line.
10/17/2024 RSBU - Building Final N/A Re-inspection required 10-17-24, missing door bell, thermostat heights in kitchen and two bedrooms not installed per approved plans, missing arch fault circuit in laundry, main water line under repaired-requires verification of proper operation, missing bonding at gas line.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0923-01475
Permit Description: SFR RKF55C T21-M0085
Total Completed Inspections - 22
Date Description Inspector Results Comments
03/20/2024 COT - RSPL - Backwater Valve Passed
03/20/2024 COT - RSPL - Rough Soil Passed
03/20/2024 COT - RSPL - Sewer Passed
03/20/2024 COT - RSPL - Yard Water Line Passed
04/02/2024 COT - RSEL - Electrical Underground Passed
04/05/2024 COT - RSBU - Excavation/Rebar/Zoning Passed 4/5/24: Plans are onsite, all post tension cabling is installed, Masa clips have been added were missing. Rebar for Ufer ground is installed in footing on east side of house. Underground electrical for living room outlet and kitchen island are installed. Okay to proceed with concrete pour.
04/05/2024 COT - RSBU - Preslab Passed 4/5/24: Plans are onsite, all post tension cabling is installed, Masa clips have been added were missing. Rebar for Ufer ground is installed in footing on east side of house. Underground electrical for living room outlet and kitchen island are installed. Okay to proceed with concrete pour.
04/05/2024 COT - RSEL - Grounding/Bonding Passed 4/5/24: Plans are onsite, all post tension cabling is installed, Masa clips have been added were missing. Rebar for Ufer ground is installed in footing on east side of house. Underground electrical for living room outlet and kitchen island are installed. Okay to proceed with concrete pour.
04/26/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed All masa clips are properly secured to bottom plate, all trusses are properly secured to top plate with H2.5 clips, bottom plates are secured to concrete floor with shot pins or bolts. All exterior sheathing for shear walls are properly secured to studs per nailing pattern on plans. Okay to proceed with window installation.
04/26/2024 COT - RSBU - Roof Nailing Passed All trusses are properly secured to top plate with H2.5 clips and plywood sheathing is properly secured to trusses with nails per plan nail pattern. Okay to proceed with dry-in of roof.
05/23/2024 COT - RSPL - Gas Pressure Test Passed
05/24/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
06/18/2024 COT - RSBU - Interior Shear Bracing Passed
07/03/2024 BULD - Electrical Clearance Passed Passed TEP ECO Clearance issued. Okay to energize panel.
09/10/2024 COT - BULD - SWG Clearance Passed SWG for meter only
10/01/2024 COT - RSEL - Outdoor Lighting Passed
10/01/2024 ENGR Engineering Final Passed
10/17/2024 RSBU - Building Progress Passed
10/23/2024 COT - RSEL - Electrical Final Passed 10/21/24: Button switch for door bell has been installed, thermostats have been lowered to 54", arch fault breaker installed for laundry room, main water line has been repaired and under street pressure, gas bond grounding wire has been installed. Al construction work is complete. Okay to issue Certificate of Occupancy.
10/23/2024 COT - RSME - Mechanical Final Passed 10/21/24: Button switch for door bell has been installed, thermostats have been lowered to 54", arch fault breaker installed for laundry room, main water line has been repaired and under street pressure, gas bond grounding wire has been installed. Al construction work is complete. Okay to issue Certificate of Occupancy.
10/23/2024 COT - RSPL - Plumbing Final Passed 10/21/24: Button switch for door bell has been installed, thermostats have been lowered to 54", arch fault breaker installed for laundry room, main water line has been repaired and under street pressure, gas bond grounding wire has been installed. Al construction work is complete. Okay to issue Certificate of Occupancy.
10/23/2024 RSBU - Building Final Passed 10/21/24: Button switch for door bell has been installed, thermostats have been lowered to 54", arch fault breaker installed for laundry room, main water line has been repaired and under street pressure, gas bond grounding wire has been installed. Al construction work is complete. Okay to issue Certificate of Occupancy.

Documents

File Name Document Type  
1_REVISION NARRATIVE-256_V1.PDF DOCUMENTS VIEW
2_SITEPLAN-UPDATED_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_APPLICATION_V1.PDF DOCUMENTS VIEW
1_SITEPLAN_V1.PDF DOCUMENTS VIEW
1_SPECIAL INSPECTION CERT-2023-09-08_V1.PDF DOCUMENTS VIEW