Permit Details

Status:
Inspections
Type:
Model Building Permit
Apply Date:
08/29/2025
Applicant:
Celina Rodriguez
Description:
Mirador Ridge Blossom 1383 Plan (Model master plan TC-MDP-0725-00409TC-MDP-0725-00409)

Permit Reviews

Permit Number - TC-MDP-0825-00470
Permit Status: Inspections
Permit Description: Mirador Ridge Blossom 1383 Plan (Model master plan TC-MDP-0725-00409TC-MDP-0725-00409)
Start Date Submittal Complete Date Status  
09/02/2025 SITE FROM MODEL PERMIT - PRODUCTION v.1 09/10/2025 REQUIRES RESUBMIT Review Details
09/11/2025 SITE FROM MODEL PERMIT - PRODUCTION v.2 09/15/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0825-00470
Permit Status: Inspections
Permit Description: Mirador Ridge Blossom 1383 Plan (Model master plan TC-MDP-0725-00409TC-MDP-0725-00409)
Total Outstanding Activity Conditions - 4
Date Name
08/27/2025 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
09/03/2025 Post-Installed Anchor Inspection Report is required.
09/03/2025 Post-Tension Inspection Report is required.
09/03/2025 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.

Conditions

Permit Number - TC-MDP-0825-00470
Permit Status: Inspections
Permit Description: Mirador Ridge Blossom 1383 Plan (Model master plan TC-MDP-0725-00409TC-MDP-0725-00409)
Date Description Comments
08/27/2025 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
08/27/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.

Outstanding Inspections

Permit Status: Inspections
Permit Number: TC-MDP-0825-00470
Permite Description: Mirador Ridge Blossom 1383 Plan (Model master plan TC-MDP-0725-00409TC-MDP-0725-00409)
Total Outstanding Inspections - 7
Last Inspection Date Description Inspector Results Comments
09/19/2025 COT - RSPL - Sewer N/A Not Ready
10/01/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing N/A Canceled 10.1.25
Work being conducted on site, trip hazards and other hazards prevalent along with visual obstruction. Site not suitable for inspection. Reinspection requires fee.
11/17/2025 COT - RSEL - Outdoor Lighting N/A Not Ready Use as a sales office will be tied to separate permit.
01/20/2026 COT - RSEL - Electrical Final N/A Re-inspection required 1/20/26: hvac condenser Disconnect box requires 3' clearance in front, accessible route does not meet requirements, properly secure conduit at wall will appropriate fasteners,
KO at main panel must be sealed, thermostat shall be no higher than 48" above finish floor, no attic access, no garage access, domestic water has not been hooked up, sewer connection has not been made, expansion tank required at water heater due to a closed loop system. Stopped inspection more items may be added. Please call future inspections under commercial permit for sales office and model home (this permit is directly correlated with the SFR)
11/17/2025 RSBU - Building Final N/A Not Ready Use as a sales office will be tied to separate permit.
11/17/2025 COT - RSME - Mechanical Final N/A Not Ready Use as a sales office will be tied to separate permit.
11/17/2025 ENGR Engineering Final N/A Not Ready Use as a sales office will be tied to separate permit.

Completed Inspections

Permit Status: Inspections
Permit Number: TC-MDP-0825-00470
Permit Description: Mirador Ridge Blossom 1383 Plan (Model master plan TC-MDP-0725-00409TC-MDP-0725-00409)
Total Completed Inspections - 14
Date Description Inspector Results Comments
09/19/2025 COT - RSPL - Rough Soil Passed
09/19/2025 COT - RSPL - Yard Water Line Passed
09/23/2025 COT - RSBU - Excavation/Rebar/Zoning Passed
09/23/2025 COT - RSBU - Preslab Passed
09/23/2025 COT - RSEL - Electrical Underground Passed
09/23/2025 COT - RSEL - Grounding/Bonding Passed
09/30/2025 COT - RSBU - Roof Nailing Passed
10/03/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
10/08/2025 COT - RSPL - Gas Pressure Test Passed 10-8-25: gas pressure test approved.
10/08/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 10-8-25: intermediates approved-okay to continue with construction.
10/13/2025 COT - RSBU - Interior Shear Bracing Passed
12/01/2025 BULD - Electrical Clearance Passed 12.1.25
approved for ECO
01/08/2026 COT - BULD - SWG Clearance Passed 01/08/2026
Clearance for Southwest Gas.
01/08/2026 COT - RSEL - Outdoor Lighting Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
MIRADOR RIDGE - LOT 3 START_V2.PDF DOCUMENTS VIEW
MRB 3 SIC-2025-08-29_V1.PDF DOCUMENTS VIEW