Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Inspection Status: Not Ready

Inspection History: ENGR Engineering Final

Permit Number - TC-MDP-0825-00470

Inspection Description - ENGR Engineering Final

Inspection Status - Not Ready

Date Description Inspector Results Comments
01/20/2026 ENGR Engineering Final Not Ready Paver pathways can not exceed 2% cross slope or 5% running slope. ramps require handrail and can not exceed 8.33%. Permit for conversion to sales office still required.
02/12/2026 ENGR Engineering Final Not Ready 2/12/26
This is not built out as a SFR. If the use is that of a sales office it can get a TCO against a commercial permit that has been issued. It will need an Accessible route from the Parking lot. Accessible Routes are to be built from acceptable material with running slope that cannot exceed 5%. Cross slope cannot exceed 2%. If Ramps are used they cannot exceed 8.33 % and must have hand railings. Landings cannot exceed 2% in either direction and need to be at the same elevation as the Finished floor. Thresholds can't exceed 1/2". If the intent is to use adjacent property 7422 for display it will need an accessible route to it from the office.
11/17/2025 ENGR Engineering Final Not Ready Use as a sales office will be tied to separate permit.