Permit Details

Status:
Issued
Type:
Model Building Permit
Apply Date:
07/25/2024
Applicant:
Celina Rodriguez
Description:
Bella Tierra Phase 3 1745-130

Permit Reviews

Permit Number - TC-MDP-0724-00815
Permit Status: Issued
Permit Description: Bella Tierra Phase 3 1745-130
Start Date Submittal Complete Date Status  
07/29/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 08/01/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0724-00815
Permit Status: Issued
Permit Description: Bella Tierra Phase 3 1745-130
Total Outstanding Activity Conditions - 5
Date Name
07/25/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
08/01/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
08/01/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
08/01/2024 Post-Tension Inspection Report is required.
08/01/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Conditions

Permit Number - TC-MDP-0724-00815
Permit Status: Issued
Permit Description: Bella Tierra Phase 3 1745-130
Date Description Comments
07/25/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Outstanding Inspections

Permit Status: Issued
Permit Number: TC-MDP-0724-00815
Permite Description: Bella Tierra Phase 3 1745-130
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
10/17/2024 COT - RSEL - Grounding/Bonding N/A Re-inspection required Concrete forms are set, post tension cabling is properly spaced per the plans, masa clips are nailed to form 36" apart, additional rebar reinforcement is installed in corners of garage footing and around tub and shower block outs, Ufer ground rebar is in place on side of garage where transformer sets, underground electrical conduit is in place for kitchen island, and all underground plumbing pipes are properly wrapped with foam wrapping. Okay to pour concrete for footings and slab on grade.
10/17/24: seal penetrations through top plate, shear wall 11 or greater requires 3”x3” washer plates, seal penetrations through vapor barrier, properly secure flex duct throughout, damaged wiring in bedroom 3, FHA plate at Kitchen exhaust hood missing, bathroom exhaust fan missing, fan fixtures must be properly secured ( drywall screws are not permitted), caulk all staples going through vapor barrier, nail plates required through, mechanical not ready, pex not under pressure. STOPPED INSPECTION MORE ITEMS MAY BE ADDED.
10/17/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. N/A Re-inspection required 10/17/24: seal penetrations through top plate, shear wall 11 or greater requires 3”x3” washer plates, seal penetrations through vapor barrier, properly secure flex duct throughout, damaged wiring in bedroom 3, FHA plate at Kitchen exhaust hood missing, bathroom exhaust fan missing, fan fixtures must be properly secured ( drywall screws are not permitted), caulk all staples going through vapor barrier, nail plates required through, mechanical not ready, pex not under pressure. STOPPED INSPECTION MORE ITEMS MAY BE ADDED.
COT - RSBU - Interior Shear Bracing N/A Scheduled

Completed Inspections

Permit Status: Issued
Permit Number: TC-MDP-0724-00815
Permit Description: Bella Tierra Phase 3 1745-130
Total Completed Inspections - 12
Date Description Inspector Results Comments
08/08/2024 COT - RSPL - Rough Soil Passed
08/08/2024 COT - RSPL - Yard Water Line Passed
08/08/2024 COT - RSPL - Sewer Passed
08/21/2024 COT - RSBU - Preslab Passed Concrete forms are set, post tension cabling is properly spaced per the plans, masa clips are nailed to form 36" apart, additional rebar reinforcement is installed in corners of garage footing and around tub and shower block outs, Ufer ground rebar is in place on side of garage where transformer sets, underground electrical conduit is in place for kitchen island, and all underground plumbing pipes are properly wrapped with foam wrapping. Okay to pour concrete for footings and slab on grade.
08/21/2024 COT - RSBU - Excavation/Rebar/Zoning Passed Concrete forms are set, post tension cabling is properly spaced per the plans, masa clips are nailed to form 36" apart, additional rebar reinforcement is installed in corners of garage footing and around tub and shower block outs, Ufer ground rebar is in place on side of garage where transformer sets, underground electrical conduit is in place for kitchen island, and all underground plumbing pipes are properly wrapped with foam wrapping. Okay to pour concrete for footings and slab on grade.
08/21/2024 COT - RSEL - Electrical Underground Passed Concrete forms are set, post tension cabling is properly spaced per the plans, masa clips are nailed to form 36" apart, additional rebar reinforcement is installed in corners of garage footing and around tub and shower block outs, Ufer ground rebar is in place on side of garage where transformer sets, underground electrical conduit is in place for kitchen island, and all underground plumbing pipes are properly wrapped with foam wrapping. Okay to pour concrete for footings and slab on grade.
09/09/2024 COT - RSBU - Exterior Clips/Sheathing Passed
09/09/2024 COT - RSBU - Roof Nailing Passed
10/17/2024 COT - RSPL - Gas Pressure Test Passed
10/22/2024 COT - RSEL - Grounding/Bonding Passed
10/24/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 10/17/24: seal penetrations through top plate, shear wall 11 or greater requires 3”x3” washer plates, seal penetrations through vapor barrier, properly secure flex duct throughout, damaged wiring in bedroom 3, FHA plate at Kitchen exhaust hood missing, bathroom exhaust fan missing, fan fixtures must be properly secured ( drywall screws are not permitted), caulk all staples going through vapor barrier, nail plates required through, mechanical not ready, pex not under pressure. STOPPED INSPECTION MORE ITEMS MAY BE ADDED.

fan fixtures must be properly secured ( drywall screws are not permitted). Replace fresh air intake due to water trapped. Water lines are not under pressure. Foam top penetration at FHA plate. Secure loose electrical lines in ceiling. 10/22/2024
10/24/24: corrections made ok to proceed.
11/01/2024 BULD - Electrical Clearance Passed 11-1-24, electrical panel cleared to be be energized.

Scheduled Inspections

Scheduled Inspections - TC-MDP-0724-00815
Status: Issued
Description: Bella Tierra Phase 3 1745-130
Scheduled Date Description Entered By Entered Date
11/05/2024 COT - RSBU - Interior Shear Bracing Scheduled
For information about today’s scheduled inspections please refer to the PDSD Daily Inspections Dashboards (Desktop) PDSD Daily Inspections Dashboards (Mobile) .

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
BTIII 50 SIC-2024-07-25_V1.PDF DOCUMENTS VIEW