Permit: TC-MDP-0724-00815
Permit Details
Apply Date:
07/25/2024
Applicant:
Celina Rodriguez
Description:
Bella Tierra Phase 3 1745-130
Permit Reviews
Permit Number - TC-MDP-0724-00815
Permit Status: Issued
Permit Description: Bella Tierra Phase 3 1745-130
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
07/29/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 08/01/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0724-00815
Permit Status: Issued
Permit Description: Bella Tierra Phase 3 1745-130
Total Outstanding Activity Conditions - 5
Date | Name |
---|---|
07/25/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
08/01/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
08/01/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
08/01/2024 | Post-Tension Inspection Report is required. |
08/01/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Conditions
Permit Number - TC-MDP-0724-00815
Permit Status: Issued
Permit Description: Bella Tierra Phase 3 1745-130
Date | Description | Comments |
---|---|---|
07/25/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
Outstanding Inspections
Permit Status: Issued
Permit Number: TC-MDP-0724-00815
Permite Description: Bella Tierra Phase 3 1745-130
Total Outstanding Inspections - 3
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/17/2024 | COT - RSEL - Grounding/Bonding | N/A | Re-inspection required | Concrete forms are set, post tension cabling is properly spaced per the plans, masa clips are nailed to form 36" apart, additional rebar reinforcement is installed in corners of garage footing and around tub and shower block outs, Ufer ground rebar is in place on side of garage where transformer sets, underground electrical conduit is in place for kitchen island, and all underground plumbing pipes are properly wrapped with foam wrapping. Okay to pour concrete for footings and slab on grade. 10/17/24: seal penetrations through top plate, shear wall 11 or greater requires 3”x3” washer plates, seal penetrations through vapor barrier, properly secure flex duct throughout, damaged wiring in bedroom 3, FHA plate at Kitchen exhaust hood missing, bathroom exhaust fan missing, fan fixtures must be properly secured ( drywall screws are not permitted), caulk all staples going through vapor barrier, nail plates required through, mechanical not ready, pex not under pressure. STOPPED INSPECTION MORE ITEMS MAY BE ADDED. |
10/17/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Re-inspection required | 10/17/24: seal penetrations through top plate, shear wall 11 or greater requires 3”x3” washer plates, seal penetrations through vapor barrier, properly secure flex duct throughout, damaged wiring in bedroom 3, FHA plate at Kitchen exhaust hood missing, bathroom exhaust fan missing, fan fixtures must be properly secured ( drywall screws are not permitted), caulk all staples going through vapor barrier, nail plates required through, mechanical not ready, pex not under pressure. STOPPED INSPECTION MORE ITEMS MAY BE ADDED. |
COT - RSBU - Interior Shear Bracing | N/A | Scheduled |
Completed Inspections
Permit Status: Issued
Permit Number: TC-MDP-0724-00815
Permit Description: Bella Tierra Phase 3 1745-130
Total Completed Inspections - 12
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/08/2024 | COT - RSPL - Rough Soil | Passed | ||
08/08/2024 | COT - RSPL - Yard Water Line | Passed | ||
08/08/2024 | COT - RSPL - Sewer | Passed | ||
08/21/2024 | COT - RSBU - Preslab | Passed | Concrete forms are set, post tension cabling is properly spaced per the plans, masa clips are nailed to form 36" apart, additional rebar reinforcement is installed in corners of garage footing and around tub and shower block outs, Ufer ground rebar is in place on side of garage where transformer sets, underground electrical conduit is in place for kitchen island, and all underground plumbing pipes are properly wrapped with foam wrapping. Okay to pour concrete for footings and slab on grade. | |
08/21/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Concrete forms are set, post tension cabling is properly spaced per the plans, masa clips are nailed to form 36" apart, additional rebar reinforcement is installed in corners of garage footing and around tub and shower block outs, Ufer ground rebar is in place on side of garage where transformer sets, underground electrical conduit is in place for kitchen island, and all underground plumbing pipes are properly wrapped with foam wrapping. Okay to pour concrete for footings and slab on grade. | |
08/21/2024 | COT - RSEL - Electrical Underground | Passed | Concrete forms are set, post tension cabling is properly spaced per the plans, masa clips are nailed to form 36" apart, additional rebar reinforcement is installed in corners of garage footing and around tub and shower block outs, Ufer ground rebar is in place on side of garage where transformer sets, underground electrical conduit is in place for kitchen island, and all underground plumbing pipes are properly wrapped with foam wrapping. Okay to pour concrete for footings and slab on grade. | |
09/09/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
09/09/2024 | COT - RSBU - Roof Nailing | Passed | ||
10/17/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
10/22/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
10/24/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 10/17/24: seal penetrations through top plate, shear wall 11 or greater requires 3”x3” washer plates, seal penetrations through vapor barrier, properly secure flex duct throughout, damaged wiring in bedroom 3, FHA plate at Kitchen exhaust hood missing, bathroom exhaust fan missing, fan fixtures must be properly secured ( drywall screws are not permitted), caulk all staples going through vapor barrier, nail plates required through, mechanical not ready, pex not under pressure. STOPPED INSPECTION MORE ITEMS MAY BE ADDED. fan fixtures must be properly secured ( drywall screws are not permitted). Replace fresh air intake due to water trapped. Water lines are not under pressure. Foam top penetration at FHA plate. Secure loose electrical lines in ceiling. 10/22/2024 10/24/24: corrections made ok to proceed. |
|
11/01/2024 | BULD - Electrical Clearance | Passed | 11-1-24, electrical panel cleared to be be energized. |
Scheduled Inspections
Scheduled Inspections - TC-MDP-0724-00815
Status: Issued
Description: Bella Tierra Phase 3 1745-130
Scheduled Date | Description | Entered By | Entered Date |
---|---|---|---|
11/05/2024 | COT - RSBU - Interior Shear Bracing | Scheduled |