Inspection Status: Passed

Inspection History: COT - RSBU - Preslab  

Permit Number - TC-MDP-0724-00815

Inspection Description - COT - RSBU - Preslab  

Inspection Status - Passed

Date Description Inspector Results Comments
08/21/2024 COT - RSBU - Preslab   Passed Concrete forms are set, post tension cabling is properly spaced per the plans, masa clips are nailed to form 36" apart, additional rebar reinforcement is installed in corners of garage footing and around tub and shower block outs, Ufer ground rebar is in place on side of garage where transformer sets, underground electrical conduit is in place for kitchen island, and all underground plumbing pipes are properly wrapped with foam wrapping. Okay to pour concrete for footings and slab on grade.